Providing and fixing soil, waste and vent pipes : 75 mm diameter

Sand cast iron S&S pipe as per IS: 1729
Item number
17.35.2.1
Analysis basis
17.42 m
Priced inputs
6
Derived rate
₹1,044.75/ M
D-01/RATE ANALYSISITEM 17.35.2.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.35.2.1 (Providing and fixing soil, waste and vent pipes : 75 mm diameter : Sand cast iron S&S pipe as per IS: 1729) is derived from 6 priced inputs for 17.42 m and works out to ₹1,044.75 per m after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • (1.8mx10)-(9x0.065m) = 17.415 m say
  • 17.42 m
ANALYSIS OF RATES · ITEM 17.35.2.1DETAILS OF COST FOR 17.42 M
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1616MATS.C.I. soil, waste and vent single socketed pipe 1.80 metres long:75mm diaS.C.I. soil, waste and vent single socketed pipe 1.80 metres long: 75 mm diaeach10.51,100.0011,550.00
9999MATScaffoldingL.S.80.732.27183.26
9977MATCarriage of materialsL.S.40.382.2791.66
0116LABFitter (grade 1)day0.35897.00313.95
0100LABBandhaniday0.17816.00138.72
0114LABBeldarday0.7736.00515.20
BUILD-UP TO RATE
TOTAL
12,792.79
Add 1 % Water charges on “W”
+127.93
TOTAL
12,920.72
Add GST on “X” (multiplying factor 0.2127)
+2,748.24
TOTAL
15,668.96
Add 15% CPOH on “Y”
+2,350.34
TOTAL
18,019.30
Add Cess @ 1% on “Z”
+180.19
Cost for 17.42 m pipe
18,199.49
Cost per metre
1,044.75
SAY
₹1,044.75
D-02/SOURCEPRINTED PAGE 1330
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1330

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1330. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.