Providing and fixing soil, waste and vent pipes : 100 mm dia
- Item number
- 17.35.1.2
- Analysis basis
- 16.87 m
- Priced inputs
- 6
- Derived rate
- ₹1,180.75/ M
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.35.1.2 (Providing and fixing soil, waste and vent pipes : 100 mm dia Centrifugally cast (spun) iron socket & spigot (S&S) pipe as per IS: 3989) is derived from 6 priced inputs for 16.87 m and works out to ₹1,180.75 per m after water charges, GST, CPOH and cess. The full build-up is below.
- (1.75mx10)-(9x0.07m) = 16.87 m
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 3620 | MAT | C.C.I.(spun) socketed soil, waste and vent pipe 1.80 metres long:100mm diaC.C.I. (spun) socketed soil, waste and vent pipe 1.80 metres long:100 mm dia | each | 10.5 | 1,194.00 | 12,537.00 |
| 9999 | MAT | Scaffolding | L.S. | 80.73 | 2.27 | 183.26 |
| 9977 | MAT | Carriage of materials | L.S. | 53.82 | 2.27 | 122.17 |
| 0116 | LAB | Fitter (grade 1) | day | 0.42 | 897.00 | 376.74 |
| 0100 | LAB | Bandhani | day | 0.21 | 816.00 | 171.36 |
| 0114 | LAB | Beldar | day | 0.83 | 736.00 | 610.88 |
- TOTAL
- 14,001.41
- Add 1 % Water charges on “W”
- +140.01
- TOTAL
- 14,141.42
- Add GST on “X” (multiplying factor 0.2127)
- +3,007.88
- TOTAL
- 17,149.30
- Add 15% CPOH on “Y”
- +2,572.40
- TOTAL
- 19,721.70
- Add Cess @ 1% on “Z”
- +197.22
- Cost for 16.87 m pipe
- 19,918.92
- Cost per metre
- 1,180.73
- SAY
- ₹1,180.75
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1329
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1329. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.