CPWD Analysis of Rates · Sanitary Installations
Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing
Rectangular shape 1500x450 mm
- Item number
- 17.32.4
- Analysis basis
- Details of cost for one no.
- Priced inputs
- 8
- Derived rate
- ₹2,093.00 / one no
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 17.32.4 — Providing and fixing mirror of superior glass (of approved quality) and of required shape and size with plastic moulded frame of approved make and shade with 6 mm thick hard board backing : Rectangular shape 1500x450 mm — is derived from 8 priced inputs for one no and works out to ₹2,093.00 per one no after water charges, GST, CPOH and cess. The full build-up is below.
- Hard board 1.50x0.45 = 0.675 sqm
- = 0.7425 sqm say 0.74sqm
- Add wastage @ 10% = 0.0675 sqm
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7115 | Rectangular shape 1500x450 mm Mirror with Plastic moulded frameMaterial | each | 1 | 700.00 | 700.00 |
| 7116 | Hard board 6 mm thickMaterial | sqm | 0.74 | 124.00 | 91.76 |
| 7048 | Rawl plug 50 mm (designation 10 no.)Rawl plug 50 mm (designation 10)Material | each | 6 | 24.00 | 144.00 |
| 0588 | Chromium plated Brass screws 25 mmMaterial | 100 Nos | 0.06 | 177.00 | 10.62 |
| 9999 | SundriesMaterial | L.S. | 1.43 | 2.27 | 3.25 |
| 9977 | Carriage of materialsMaterial | L.S. | 4.16 | 2.27 | 9.44 |
| 0112 | Carpenter 2nd classLabour | day | 0.33 | 816.00 | 269.28 |
| 0114 | BeldarLabour | day | 0.33 | 736.00 | 242.88 |
- TOTAL
- 1,471.23
- Add 1 % Water charges on “W”
- 14.71
- TOTAL
- 1,485.94
- Add GST on “X” (multiplying factor 0.2127)
- 316.06
- TOTAL
- 1,802.00
- Add 15% CPOH on “Y”
- 270.30
- TOTAL
- 2,072.30
- Add Cess @ 1% on “Z”
- 20.72
- Cost of each
- 2,093.02
- Say
- 2,093.00
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1326. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.