Providing and laying pressed clay tiles (as per approved pattern 20 mm nominal thickness of approved size) on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) and finished neat complete

Item number
12.20
Analysis basis
Details of cost for 10 sqm.
Priced inputs
7
Derived rate
709.75 / Sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 12.20 Providing and laying pressed clay tiles (as per approved pattern 20 mm nominal thickness of approved size) on roofs jointed with cement mortar 1:4 (1 cement : 4 coarse sand) mixed with 2% integral water proofing compound, laid over a bed of 20 mm thick cement mortar 1:4 (1 cement : 4 coarse sand) and finished neat complete — is derived from 7 priced inputs for 10 sqm and works out to ₹709.75 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • Cement mortar 1 : 4 (1 cement : 4 coarse
  • sand)
  • Integral water proofing compound 2% by
  • weight of cement
  • Cement mortar 1 : 4 (1 cement : 4 coarse
  • sand)
CodeInputUnitQuantityRate (INR)Amount (INR)
7266Pressed clay tiles 20 mm thick 250 x 250 mm sizePressed clay tiles 20 mm thick 250x250 mm sizeMaterial1000 Nos0.168,800.001,408.00
Rate as per Item Number 3.9 of SH: MortarsRate as per item 3.9Sub-analysiscum0.0374,211.70155.83
1213Water proofing materialsMaterialkilogram0.0145.000.45
Rate as per Item Number 3.9 of SH: MortarsRate as per item 3.9Sub-analysiscum0.2244,211.70943.42
0123Mason 1st classMason 1st classLabourday0.6897.00538.20
0114BeldarLabourday2.6736.001,913.60
9999SundriesMaterialL.S.132.2729.51
TOTAL
4,989.01
Add 1 % Water charges on “W”
49.89
TOTAL
5,038.90
Add GST on “X” (multiplying factor 0.2127)
1,071.77
TOTAL
6,110.67
Add 15% CPOH on “Y”
916.60
TOTAL
7,027.27
Add Cess @ 1% on “Z”
70.27
Cost of 10.00 sqm.
7,097.54
Cost of 1 Sqm.
709.75
Say
709.75

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 877. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.