Providing and fixing fibre cement reinforced by organic fibres and/or inorganic synthetic fibres roofing accessories in all colours with polymer coated J or L hooks, bolts and nuts and or G.I. seam bolts and nuts, G.I. plain and bitumen washers or with self drilling fastener and EPDM washer etc. complete

Ridge finials

Item number
12.13.6
Priced inputs
2
Derived rate
303.70 / pair

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 12.13.6 Providing and fixing fibre cement reinforced by organic fibres and/or inorganic synthetic fibres roofing accessories in all colours with polymer coated J or L hooks, bolts and nuts and or G.I. seam bolts and nuts, G.I. plain and bitumen washers or with self drilling fastener and EPDM washer etc. complete: Ridge finials — is derived from 2 priced inputs and works out to ₹303.70 per pair after water charges, GST, CPOH and cess. The full build-up is below.

  • Details of a pair of ridge final
  • Ride final = pair
  • Total = 1.05 pair
  • Add 5% wastage = 0.05pair.
CodeInputUnitQuantityRate (INR)Amount (INR)
0233Fibre reinforced by organic fibres and/or inorganic synthetic fibres cement ridge finialMaterialpair1.05180.00189.00
9988Carriage, sundries, fixing charges including providing and fixing, seam bolts and nuts, with G.I. and bitumen washersMaterialL.S.10.792.2724.49
TOTAL
213.49
Add 1 % Water charges on “W”
2.13
TOTAL
215.62
Add GST on “X” (multiplying factor 0.2127)
45.86
TOTAL
261.48
Add 15% CPOH on “Y”
39.22
TOTAL
300.70
Add Cess @ 1% on “Z”
3.01
Cost of 1.00 pair
303.71
Say
303.70

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 871. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.