Skip to main content
R/DAR 2023

Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge

Item number
16.95
Priced inputs
5
Derived rate
₹4,569.25/ CUM
D-01/RATE ANALYSISITEM 16.95

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.95 (Providing & making Gabion structure with Mechanically Woven Double Twisted Hexagonal Shaped Wire mesh Gabion Boxes as per IS 16014:2012,MORTH Clause 2500, of required size, Mesh Type 10x12(D=100 mm with tolerance of ± 2%) Zinic+PVC coated, Mesh wire diameter2.7/3.7mm, mechanically edged/selvedged with partitions at every 1m interval and shall have minimum 10 numbers of openings per meter of mesh perpendicular to twist, tying with lacing wire of diameter 2.2/3.2mm(ID/OD), supplied @3% by weight of Gabion boxes, filled with boulders with least dimension of 200 mm, as per drawing, all complete as per directions of Engineer-in-charge) is derived from 5 priced inputs and works out to ₹4,569.25 per cum after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Details cost of one Gabion box/Crates of
  • size 2mx1mx1m = 2 cum
  • Surface area required = 11.00 sqm.
ANALYSIS OF RATES · ITEM 16.95
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
8577MATCrates made of Mesh type 10x12 (D=100 mm) Zn+PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD)Crates made of Mesh type 10x12 (D=100 mm) Zn+PVC coated. Mesh wire diameter 2.70/3.70 mm (ID/OD).sqm11280.003,080.00
7753MATStone boulder with least dimension 200mmStone Boulder 50 mm to 200 mmcum2875.001,750.00
0128LABMateday0.1816.0081.60
0125LABMason (for plain stone work) 2nd classday0.5816.00408.00
0114LABBeldarday1.5736.001,104.00
BUILD-UP TO RATE
TOTAL
6,423.60
Add 1 % Water charges on “W”
+64.24
TOTAL
6,487.84
Add GST on “X” (multiplying factor 0.2127)
+1,379.96
TOTAL
7,867.80
Add 15% CPOH on “Y”
+1,180.17
TOTAL
9,047.97
Add Cess @ 1% on “Z”
+90.48
Cost of 2 cum
9,138.45
Cost of 1 cum
4,569.23
SAY
₹4,569.25
D-02/SOURCEPRINTED PAGE 1277
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1277

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1277. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.