Sub analysis item for fabrication charges of Item No. 16.81
- Item number
- 16.81Y
- Analysis basis
- 2.5 metre
- Priced inputs
- 12
- Derived rate
- ₹1,673.35/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.81Y (Sub analysis item for fabrication charges of Item No. 16.81) is derived from 12 priced inputs for 2.5 metre and works out to ₹1,673.35 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- Sub analysis item no.16.81Y to be used in
- Item No. 16.81
- Cutting, assembling and erection charges
- Labour for riveting / bolting / cutting etc.
- Shifting including transportation, re-erection
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1215 | MAT | Welding by electric plant | cm | 165 | 2.50 | 412.50 |
| 0102 | LAB | Blacksmith 1st class | day | 0.115 | 897.00 | 103.16 |
| 0103 | LAB | Blacksmith 2nd class | day | 0.115 | 816.00 | 93.84 |
| 0100 | LAB | Bandhani | day | 0.11 | 816.00 | 89.76 |
| 0114 | LAB | Beldar | day | 0.83 | 736.00 | 610.88 |
| 9999 | MAT | Sundries | L.S. | 12.1 | 2.27 | 27.47 |
| 0116 | LAB | Fitter (grade 1) | day | 0.41 | 897.00 | 367.77 |
| 0103 | LAB | Blacksmith 2nd class | day | 0.54 | 816.00 | 440.64 |
| 0100 | LAB | Bandhani | day | 0.7 | 816.00 | 571.20 |
| 0114 | LAB | Beldar | day | 0.54 | 736.00 | 397.44 |
| 0139 | LAB | Skilled Beldar (for floor rubbing etc.) | day | 0.81 | 816.00 | 660.96 |
| 9999 | MAT | Sundries | L.S. | 12.1 | 2.27 | 27.47 |
- TOTAL
- 3,803.09
- etc. @ 10%
- +380.31
- TOTAL Cost of 2.5 metre
- 4,183.40
- Cost of 1 metre
- 1,673.36
- SAY
- ₹1,673.35
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1267
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1267. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.