Brick edging laid lengthwise with half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres
- Item number
- 16.8.1
- Analysis basis
- 10 metre
- Priced inputs
- 5
- Derived rate
- ₹53.45/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.8.1 (Brick edging laid lengthwise with half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres: With common burnt clay F.P.S. (non modular) bricks of class designation 7.5) is derived from 5 priced inputs for 10 metre and works out to ₹53.45 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- including 12% wastage
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 2602 | MAT | Common burnt clay F.P.S. (non modular) bricks class designation 7.5 | 1000 Nos | 0.049 | 4,724.00 | 231.48 |
| 0123 | LAB | Mason 1st classMason 1st class | day | 0.04 | 897.00 | 35.88 |
| 0124 | LAB | Mason 2nd classMason 2nd class | day | 0.04 | 816.00 | 32.64 |
| 0115 | LAB | Coolie | day | 0.09 | 736.00 | 66.24 |
| 9999 | MAT | Removal of rubbish | L.S. | 4.16 | 2.27 | 9.44 |
- TOTAL
- 375.68
- Add 1 % Water charges on “W”
- +3.76
- TOTAL
- 379.44
- Add GST on “X” (multiplying factor 0.2127)
- +80.71
- TOTAL
- 460.15
- Add 15% CPOH on “Y”
- +69.02
- TOTAL
- 529.17
- Add Cess @ 1% on “Z”
- +5.29
- Cost for 10 metre
- 534.46
- Cost per metre
- 53.45
- SAY
- ₹53.45
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1152
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1152. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.