CPWD Analysis of Rates · Road Work
Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres
With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
- Item number
- 16.7.1
- Analysis basis
- Details of cost for 10 metre
- Priced inputs
- 6
- Derived rate
- ₹194.30 / metre
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.7.1 — Brick edging in full brick width and half brick depth including excavation, refilling and disposal of surplus earth lead upto 50 metres With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 — is derived from 6 priced inputs for 10 metre and works out to ₹194.30 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- including 12% wastage
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 2602 | Common burnt clay F.P.S. (non modular) bricks class designation 7.5Material | 1000 Nos | 0.16 | 4,724.00 | 755.84 |
| 0123 | Mason 1st classMason 1st classLabour | day | 0.17 | 897.00 | 152.49 |
| 0124 | Mason 2nd classMason 2nd classLabour | day | 0.17 | 816.00 | 138.72 |
| 0115 | CoolieLabour | day | 0.35 | 736.00 | 257.60 |
| 9999 | Removal of rubbishMaterial | L.S. | 17.94 | 2.27 | 40.72 |
| 9999 | SundriesMaterial | L.S. | 8.97 | 2.27 | 20.36 |
- TOTAL
- 1,365.73
- Add 1 % Water charges on “W”
- 13.66
- TOTAL
- 1,379.39
- Add GST on “X” (multiplying factor 0.2127)
- 293.40
- TOTAL
- 1,672.79
- Add 15% CPOH on “Y”
- 250.92
- TOTAL
- 1,923.71
- Add Cess @ 1% on “Z”
- 19.24
- Cost for 10 metre
- 1,942.95
- Cost per metre
- 194.30
- Say
- 194.30
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1152. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.