Supplying, stacking and Spreading 6 mm thick red bajri, watering and rolling complete including preparation of the surface and rolling

With road roller/ hand roller
Item number
16.6.1
Analysis basis
6 mm
Priced inputs
5
Derived rate
₹24.45/ MM
D-01/RATE ANALYSISITEM 16.6.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.6.1 (Supplying, stacking and Spreading 6 mm thick red bajri, watering and rolling complete including preparation of the surface and rolling With road roller/ hand roller) is derived from 5 priced inputs for 6 mm and works out to ₹24.45 per mm after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • area
  • (A) Supplying and stacking of Red bajri at
  • site.
  • (B) Spreading of red bajri
  • Roller charges (one roller does 1860sqm.
  • consolidation per day of 8 hours and uses
  • 18 litres of diesel oil)
ANALYSIS OF RATES · ITEM 16.6.1DETAILS OF COST FOR 6 MM THICK AND 100 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0304MATBajricum0.61,100.00660.00
0114LABBeldarday0.54736.00397.44
0101LABBhistiday0.54816.00440.64
0003MACHHire charges of Diesel Road Roller - 8 to 10 tonneday0.0543,350.00180.90
0113LABChowkidarday0.054736.0039.74
BUILD-UP TO RATE
TOTAL
1,718.72
Add 1 % Water charges on “W”
+17.19
TOTAL
1,735.91
Add GST on “X” (multiplying factor 0.2127)
+369.23
TOTAL
2,105.14
Add 15% CPOH on “Y”
+315.77
TOTAL
2,420.91
Add Cess @ 1% on “Z”
+24.21
Cost for 100 sqm.
2,445.12
Cost per sqm.
24.45
SAY
₹24.45
D-02/SOURCEPRINTED PAGE 1151
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1151

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1151. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.