Skip to main content
R/DAR 2023

Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge

Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade
Item number
16.70.2
Analysis basis
10 sqm
Priced inputs
5
Derived rate
₹1,067.10/ SQM
D-01/RATE ANALYSISITEM 16.70.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.70.2 (Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge Made of G.I. wire of dia. 4 mm, PVC coated to achieve outer dia not less than 5 mm in required colour and shade) is derived from 5 priced inputs for 10 sqm and works out to ₹1,067.10 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • G.I. chain link 50x50 mm mesh PVC coated
  • = 10.00 sqm.
  • Wastage @ 5% = 0.50 sqm.
  • Total = 10.50 sqm.
ANALYSIS OF RATES · ITEM 16.70.2DETAILS OF COST FOR 10 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
8696MATChain link fabric fencing mesh of size 50x50 mm made of G.I. wire of dia 4 mm, PVC coated to outer dia 5 mmsqm10.5363.003,811.50
9977MATCarriage.L.S.1562.27354.12
0103LABBlacksmith 2nd classday2.14816.001,746.24
0114LABBeldarday1.62736.001,192.32
9999MATSundries including G.I. wire, nuts and bolts and warshersL.S.174.752.27396.68
BUILD-UP TO RATE
TOTAL
7,500.86
Add 1 % Water charges on “W”
+75.01
TOTAL
7,575.87
Add GST on “X” (multiplying factor 0.2127)
+1,611.39
TOTAL
9,187.26
Add 15% CPOH on “Y”
+1,378.09
TOTAL
10,565.35
Add Cess @ 1% on “Z”
+105.65
Cost for 10 sqm.
10,671.00
Cost for 1 sqm.
1,067.10
SAY
₹1,067.10
D-02/SOURCEPRINTED PAGE 1254
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1254

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1254. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.