Sub Analysis X for sub analysis item Number 16.52Y

Item number
16.52X
Analysis basis
1cum of
Priced inputs
7
Derived rate
₹2,665.15/ CUM
D-01/RATE ANALYSISITEM 16.52X

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.52X (Sub Analysis X for sub analysis item Number 16.52Y) is derived from 7 priced inputs for 1cum of and works out to ₹2,665.15 per cum after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Sub Analysis 16.52X for use in sub analysis
  • of 16.52Y
  • mortar 1:2:3 (lime:2 flyash:3 coarse sand).
ANALYSIS OF RATES · ITEM 16.52XDETAILS OF COST FOR 1CUM OF LIME FLYASH
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0773MATUnslaked limequintal1.52325.00494.00
1980MATFlyashFly ashcum0.4812.005.76
0982MATCoarse sand (zone III)cum0.721,450.001,044.00
0114LABBeldarday0.9736.00662.40
0101LABBhistiday0.45816.00367.20
9999MATRunning and upkeep of mortar millL.S.26.912.2761.09
9999MATSundriesL.S.13.522.2730.69
BUILD-UP TO RATE
TOTAL
2,665.14
Cost of 1.00 cum
2,665.14
SAY
₹2,665.15
D-02/SOURCEPRINTED PAGE 1218
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1218

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1218. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.