Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy

For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm
Item number
16.36.1
Analysis basis
370 sqm
Priced inputs
20
Derived rate
₹505.65/ SQM
D-01/RATE ANALYSISITEM 16.36.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.36.1 (Providing and laying Bitumen Penetration Macadam with hard stone aggregate of quality, size and grading as specified, with bitumen of suitable penetration grade, including required key aggregate as specified, spreading coarse aggregate with the help of self propelled/ tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader complete, including consolidation with road roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surface accuracy : For 50mm compacted thickness using coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. With paving asphalt grade VG - 10 @ 50 kg/ 10 sqm) is derived from 20 priced inputs for 370 sqm and works out to ₹505.65 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Taking stone aggregate 40mm = 45%
  • 20mm = 44%
  • 11.2mm = 8%
  • Stone dust = 3%
  • @ 50kg/10 sqm.
  • (B) Labour:
  • for spreading stone metal
  • for hand packing
  • dry rolling
  • Bajri spreader
  • for spreading key aggregate
  • for spraying bitumen
  • of power roller
  • (C) Machinery :
ANALYSIS OF RATES · ITEM 16.36.1DETAILS OF COST FOR 370 SQM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0293MATStone Aggregate (Single size) : 40 mm nominal sizecum9.991,400.0013,986.00
0295MATStone Aggregate (Single size) : 20 mm nominal sizecum9.771,425.0013,922.25
0297MATStone Aggregate (Single size) : 10 mm nominal sizecum1.781,400.002,492.00
1159MATStone dustcum0.61,100.00660.00
0295MATStone Aggregate (Single size) : 20 mm nominal sizecum2.331,425.003,320.25
0296MATStone Aggregate (Single size) : 12.5 mm nominal sizecum2.661,400.003,724.00
1159MATStone dustcum0.561,100.00616.00
2916MATPaving Asphalt VG -10 of approved qualityPaving Asphalt VG 10 of approved qualitytonne1.8533,530.0062,030.50
0114LABBeldarday16.67736.0012,269.12
0114LABBeldarday5.33736.003,922.88
0114LABBeldarday2.67736.001,965.12
0114LABBeldarday1.33736.00978.88
0138LABSprayer (for bitumen, tar etc.)day0.67816.00546.72
0114LABBeldarday1.33736.00978.88
0114LABBeldarday6.67736.004,909.12
0114LABBeldarday0.67736.00493.12
0128LABMateday1.77816.001,444.32
0001MACHHire charges of Coaltar Boiler 900 to 1400 litresday0.45900.00405.00
0003MACHHire charges of Diesel Road Roller - 8 to 10 tonneday0.613,350.002,043.50
9999MATMisc. items as spray nozzle, joint paper, coconut oil, country soap etcL.S.3512.27796.77
BUILD-UP TO RATE
TOTAL
1,31,504.43
Add 1 % Water charges on “W”
+1,315.04
TOTAL
1,32,819.47
Add GST on “X” (multiplying factor 0.2127)
+28,250.70
TOTAL
1,61,070.17
Add 15% CPOH on “Y”
+24,160.53
TOTAL
1,85,230.70
Add Cess @ 1% on “Z”
+1,852.31
Cost for 370 Sqm.
1,87,083.01
Cost per sqm.
505.63
SAY
₹505.65
D-02/SOURCEPRINTED PAGE 1191
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1191

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1191. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.