Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications

On W.B.M. @ 0.75 Kg / sqm

Item number
16.30.1
Analysis basis
Details of cost for 100 sqm.
Priced inputs
11
Derived rate
60.50 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.30.1 Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications : On W.B.M. @ 0.75 Kg / sqm — is derived from 11 priced inputs for 100 sqm and works out to ₹60.50 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • (with thick wire)
  • (a) For cleaning :
  • (b) For heating bitumen:
  • (c) For applying tack coat:
CodeInputUnitQuantityRate (INR)Amount (INR)
2916Paving Asphalt VG -10 of approved qualityPaving Asphalt VG 10 of approved qualityMaterialtonne0.07533,530.002,514.75
0370Coal (steam)Materialquintal0.15500.0075.00
0364Wire brushMaterialeach0.0525.001.25
0365Soft brushMaterialeach0.1225.003.00
9999Gunny bagsMaterialL.S.7.82.2717.71
0007Hire charges of Coaltar SprayerMachineryday0.03400.0012.00
9999SundriesMaterialL.S.9.12.2720.66
0128MateLabourday0.06816.0048.96
0114BeldarLabourday1.46736.001,074.56
0114BeldarLabourday0.19736.00139.84
0114BeldarLabourday0.47736.00345.92
TOTAL
4,253.65
Add 1 % Water charges on “W”
42.54
TOTAL
4,296.19
Add GST on “X” (multiplying factor 0.2127)
913.80
TOTAL
5,209.99
Add 15% CPOH on “Y”
781.50
TOTAL
5,991.49
Add Cess @ 1% on “Z”
59.91
Cost for 100 sqm.
6,051.40
Cost per Sqm.
60.51
Say
60.50

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1178. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.