CPWD Analysis of Rates · Road Work
Supplying and stacking at site
Over burnt (Jhama) brick aggregate 120 mm to 40 mm
- Item number
- 16.3.4
- Analysis basis
- Details of cost for 1 cum.
- Priced inputs
- 1
- Derived rate
- ₹798.10 / cum
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.3.4 — Supplying and stacking at site Over burnt (Jhama) brick aggregate 120 mm to 40 mm — is derived from 1 priced inputs for 1 cum and works out to ₹798.10 per cum after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 2908 | Over burnt (Jhama) Brick Aggregate: 120 mm to 40 mm sizeMaterial | cum | 1 | 561.00 | 561.00 |
- TOTAL
- 561.00
- Add 1 % Water charges on "W"
- 5.61
- TOTAL
- 566.61
- Add GST on "X" (multiplying factor 0.2127)
- 120.52
- TOTAL
- 687.13
- Add 15% CPOH on "Y"
- 103.07
- TOTAL
- 790.20
- Add Cess @ 1% on "Z"
- 7.90
- Cost for 1 cum
- 798.10
- Say
- 798.10
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1147. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.