R/DAR 2023

Supplying and stacking at site

Moorum
Item number
16.3.10
Analysis basis
1 cum
Priced inputs
1
Derived rate
₹768.25/ CUM
D-01/RATE ANALYSISITEM 16.3.10

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.3.10 (Supplying and stacking at site Moorum) is derived from 1 priced inputs for 1 cum and works out to ₹768.25 per cum after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 16.3.10DETAILS OF COST FOR 1 CUM
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0810MATMoorumcum1540.00540.00
BUILD-UP TO RATE
TOTAL
540.00
Add 1 % Water charges on "W"
+5.40
TOTAL
545.40
Add GST on "X" (multiplying factor 0.2127)
+116.01
TOTAL
661.41
Add 15% CPOH on "Y"
+99.21
TOTAL
760.62
Add Cess @ 1% on "Z"
+7.61
Cost for one cum.
768.23
SAY
₹768.25
D-02/SOURCEPRINTED PAGE 1149
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1149

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1149. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.