Providing and fixing precast reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) kilometre stone as per standard design, including finishing smooth in 1:3 cement mortar (1 cement : 3 fine sand) but excluding the cost of earth work, concrete in foundation, painting and lettering etc. which shall be paid for separately

50x152.5x25 cm size
Item number
16.24.2
Analysis basis
one stone
Priced inputs
21
Derived rate
₹5,170.25/ ONE STONE
D-01/RATE ANALYSISITEM 16.24.2

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.24.2 (Providing and fixing precast reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) kilometre stone as per standard design, including finishing smooth in 1:3 cement mortar (1 cement : 3 fine sand) but excluding the cost of earth work, concrete in foundation, painting and lettering etc. which shall be paid for separately 50x152.5x25 cm size) is derived from 21 priced inputs for one stone and works out to ₹5,170.25 per one stone after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • (i) Cement concrete 1:1.5:3 (1 cement :1.5
  • Coarse sand :3 graded stone aggregate
  • 20mm nominal size)
  • 0.50x0.25x1.145m = 0.143cum. +
  • 0.52x0.27x0.13m = 0.018cum. +
  • 1/2x22/7x(0.25)²x0.25m = 0.025cum.
  • = 0.186 cum.
  • (ii) Extra for laying cement concrete in RCC
  • work
  • (iii) M.S. reinforcement0.19cum @48.06kg/cum. =9.131kg.
  • (iv) Centering and shuttering(0.50+2x0.25)x1.145 = 1.145 sqm
  • 1/2x(0.25)²x3.142 = 0.098
  • 3.142(0.25)x(0.25) =0.196
  • (0.52+2x0.27)x0.13 =0.138
  • 2x0.52x0.01 =0.10
  • 2x2x0.25x0.01 =0.010
  • 1x0.50x0.25 =0.125
  • =1.722sqm. Say 1.72 sqm
  • (v) 6mm cement plaster 1:3 (1 Cement : 3
  • fine sand)Qty. as per centering and shuttering
  • = 1.722sqm. +
  • 0.50x1.145 = 0.572 +
  • 0.52x0.13 = 0.068sqm. +
  • 1/2x(0.25)²x3.142 = 0.098 +
  • 2x0.52x001 = 0.010
  • = 2.470sqm Sq. 2.47 sqm.
  • Labour for plaster
  • (vi) Labour for fixing
  • Say 0.19cum.
  • Say 9.13 kg.
ANALYSIS OF RATES · ITEM 16.24.2DETAILS OF COST FOR ONE STONE
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
SUBRate as per item no 4.1.2 of S.H. Concrete WorkRate as per item 4.1.2cum0.198,340.851,584.76
0114LABBeldarday0.019736.0013.98
0101LABBhistiday0.038816.0031.01
0123LABMason 1st classMason 1st classday0.008897.007.18
0124LABMason 2nd classMason 2nd classday0.008816.006.53
0128LABMateday0.008816.006.53
SUBRate as per item no. 5.22.1 of SH : Reinforced cement concrete workRate as per item 5.22.1kg9.13107.10977.82
SUBRate as per item No.5.9.1 of SH : Reinforced cement concrete workRate as per item 5.9.1sqm1.72392.15674.50
0367MATPortland Cement (OPC-43 grade)tonne0.095,156.00464.04
0983MATFine sand (zone IV)cum0.2980.00196.00
0114LABBeldarday0.013736.009.57
0101LABBhistiday0.001816.000.82
9999MATHire and running charges of mixerL.S.0.522.271.18
9999MATSundriesL.S.0.262.270.59
0155LABMason (average)day0.126857.00107.98
0115LABCoolieday0.185736.00136.16
0101LABBhistiday0.227816.00185.23
9999MATExtra for removing burrL.S.3.382.277.67
9999MATScaffolding, sundries etc.L.S.2.862.276.49
0114LABBeldarday0.2736.00147.20
9977MATCarriage to siteL.S.13.522.2730.69
BUILD-UP TO RATE
TOTAL
4,595.93
Add 1 % Water charges on “W-A”
+13.59
TOTAL
4,609.52
Add GST on “X-A” (multiplying factor 0.2127)
+291.92
TOTAL
4,901.44
Add 15% CPOH on “Y-A”
+249.65
TOTAL
5,151.09
Add Cess @ 1% on “Z-A”
+19.14
Cost per stone
5,170.23
SAY
₹5,170.25
D-02/SOURCEPRINTED PAGE 1168
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1168

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1168. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.