Skip to main content

CPWD Analysis of Rates · Road Work

Providing and fixing 15 cm dia at top, 20 cm at bottom and 90 cm high precast reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) boundary stone as per standard design, including finishing smooth with cement mortar 1:3 (1 cement : 3 fine sand) (cost of excavation, refilling and concreting to be paid for separately)

Item number
16.23
Analysis basis
Details of cost for 10 Nos. stone
Priced inputs
21
Derived rate
852.40 / Nos

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.23 Providing and fixing 15 cm dia at top, 20 cm at bottom and 90 cm high precast reinforced cement concrete 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) boundary stone as per standard design, including finishing smooth with cement mortar 1:3 (1 cement : 3 fine sand) (cost of excavation, refilling and concreting to be paid for separately) — is derived from 21 priced inputs for 10 Nos and works out to ₹852.40 each after water charges, GST, CPOH and cess. The full build-up is below.

  • (i) Cement concrete 1:1½:3 (1 cement : 1½
  • Coarse sand : 3 graded stone aggregate
  • 20mm nominal size)
  • Volume of frustum of cone:
  • L/3 x [A1+A2+sqrt(A1A2)] = (0.825/3) x
  • [0.095²+0.075² + sqrt(0.095 x 0.075²)]
  • x3.142=0.01882 (A)
  • Volume of hemi sphere:
  • ½ x 4 /3 x PI x r³ = ½x(4/ 3)x(22/7)
  • x0.075³=0.00100 (B)
  • Total volume one Nos.= A+B = 0.01982 Say
  • 0.02cum, Volume for 10 Nos. = 10x0.02=
  • 0.2 cum
  • (ii) Extra for laying cement concerte in RCC
  • work
  • (iii) M.S. reinforcement- 6mm dia. Bar
  • 5.99 metre =10x 5.99x0.22 =13.2kg.
  • (iv) Centering and shuttering1/2x3.142 (0.19+0.15)x0.825 =0.441 +
  • 3.142/4(0.19)² =0.028 +
  • 1/2x4x3.142(0.075)² = 0.035
  • = 0.504 Say 0.50sqm
  • Qty for 10 Nos. = 10x0.50 = 5.00 sqm
  • (v) 6mm cement plaster 1:3 (1 Cement : 3
  • fine sand)1/2x3.142 (0.19+0.15)x0.825 =0.44 +
  • 3.142/4(0.19)² =0.028 +
  • 1/2x4x3.142(0.075)² = 0.035
  • = 0.504 Say 0.50sqm
  • Qty for 10 Nos. = 10x0.50 = 5.00 sqm
  • Labour for plaster
  • (vi) Labour for fixing
CodeInputUnitQuantityRate (INR)Amount (INR)
Rate as per item no 4.1.2 of S.H. Concrete WorkRate as per item 4.1.2Sub-analysiscum0.28,340.851,668.17
0114BeldarLabourday0.02736.0014.72
0101BhistiLabourday0.04816.0032.64
0123Mason 1st classMason 1st classLabourday0.008897.007.18
0124Mason 2nd classMason 2nd classLabourday0.008816.006.53
0128MateLabourday0.008816.006.53
Rate as per item no. 5.22.1 of SH : RCC workRate as per item 5.22.1Sub-analysiskg13.2107.101,413.72
Rate as per item No.5.9.1 of SH : Reinforced cement concrete workRate as per item 5.9.1Sub-analysissqm5392.151,960.75
0367Portland Cement (OPC-43 grade)Materialtonne0.0185,156.0092.81
0983Fine sand (zone IV)Materialcum0.385980.00377.30
0114BeldarLabourday0.027736.0019.87
0101BhistiLabourday0.002816.001.63
9999Hire and running charges of mixerMaterialL.S.12.272.27
9999SundriesMaterialL.S.0.52.271.14
0155Mason (average)Labourday0.26857.00222.82
0115CoolieLabourday0.38736.00279.68
0101BhistiLabourday0.46816.00375.36
9999Extra for removing burrMaterialL.S.6.82.2715.44
9999Scaffolding, sundries etc.MaterialL.S.62.2713.62
0114BeldarLabourday1.2736.00883.20
9977Carriage to siteMaterialL.S.41.62.2794.43
TOTAL
7,489.81
Add 1 % Water charges on “W-A”
24.47
TOTAL
7,514.28
Add GST on “X-A” (multiplying factor 0.2127)
525.72
TOTAL
8,040.00
Add 15% CPOH on “Y-A”
449.60
TOTAL
8,489.60
Add Cess @ 1% on “Z-A”
34.47
Cost of 10 nos. stone
8,524.07
Cost of each.
852.41
Say
852.40

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1165. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works