CPWD Analysis of Rates · Road Work

Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete

Item number
16.19
Analysis basis
Details of cost for 1 qunital
Priced inputs
6
Derived rate
125.75 / qunital

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.19 Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete — is derived from 6 priced inputs for 1 qunital and works out to ₹125.75 per qunital after water charges, GST, CPOH and cess. The full build-up is below.

  • M.S. angle = 1.00 qtl.
  • Total = =1.05 qtl
  • For spotting, bending of angle and drilling
  • holes etc. :
  • Add 5% wastage = 0.05 qtl.
CodeInputUnitQuantityRate (INR)Amount (INR)
1007Structurals such as tees,angles channels and R.S. joistsStructural steel such as tees, angles channels and R.S. joistsMaterialquintal1.055,965.006,263.25
0103Blacksmith 2nd classLabourday0.75816.00612.00
0114BeldarLabourday0.5736.00368.00
0103Blacksmith 2nd classLabourday1816.00816.00
0114BeldarLabourday1736.00736.00
9999Sundries such as drilling bit etc.MaterialL.S.19.762.2744.86
TOTAL
8,840.11
Add 1 % Water charges on “W”
88.40
TOTAL
8,928.51
Add GST on “X” (multiplying factor 0.2127)
1,899.09
TOTAL
10,827.60
Add 15% CPOH on “Y”
1,624.14
TOTAL
12,451.74
Add Cess @ 1% on “Z”
124.52
Cost for 1 qunital
12,576.26
Cost of one kg
125.76
Say
125.75

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1163. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.