Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete

Item number
16.19
Analysis basis
1 qunital
Priced inputs
6
Derived rate
₹125.75/ QUNITAL
D-01/RATE ANALYSISITEM 16.19

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.19 (Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete) is derived from 6 priced inputs for 1 qunital and works out to ₹125.75 per qunital after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • M.S. angle = 1.00 qtl.
  • Total = =1.05 qtl
  • For spotting, bending of angle and drilling
  • holes etc. :
  • Add 5% wastage = 0.05 qtl.
ANALYSIS OF RATES · ITEM 16.19DETAILS OF COST FOR 1 QUNITAL
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1007MATStructurals such as tees,angles channels and R.S. joistsStructural steel such as tees, angles channels and R.S. joistsquintal1.055,965.006,263.25
0103LABBlacksmith 2nd classday0.75816.00612.00
0114LABBeldarday0.5736.00368.00
0103LABBlacksmith 2nd classday1816.00816.00
0114LABBeldarday1736.00736.00
9999MATSundries such as drilling bit etc.L.S.19.762.2744.86
BUILD-UP TO RATE
TOTAL
8,840.11
Add 1 % Water charges on “W”
+88.40
TOTAL
8,928.51
Add GST on “X” (multiplying factor 0.2127)
+1,899.09
TOTAL
10,827.60
Add 15% CPOH on “Y”
+1,624.14
TOTAL
12,451.74
Add Cess @ 1% on “Z”
+124.52
Cost for 1 qunital
12,576.26
Cost of one kg
125.76
SAY
₹125.75
D-02/SOURCEPRINTED PAGE 1163
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1163

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1163. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSROAD WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.