Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used
- Item number
- 16.18.1
- Analysis basis
- 333.24 metre
- Priced inputs
- 8
- Derived rate
- ₹22.10/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.18.1 (Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used With G.I. barbed wire) is derived from 8 priced inputs for 333.24 metre and works out to ₹22.10 per metre after water charges, GST, CPOH and cess. The full build-up is below.
- G.I. barbed wire
- 30x9 = 270.00m
- 2x10x(12+32)1/2 = 63.24
- = 333.24m
- 333.24m @ 9.38kg/100m =31.26 kg say
- 0.31 q
- Supplying and fixing Turn buckle & staple
- Labour for fixing posts in line and fixing and
- stretching wire:
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 1029 | MAT | Galvanised steel barbed wireGalvanised steel barbed wire of 9.8 kg /100metre | quintal | 0.31 | 5,500.00 | 1,705.00 |
| SUB | Rate as per Item Number 16.16 of SH: Road WorkRate as per item 16.16 | each set | 10 | 274.30 | 2,743.00 | |
| 9999 | MAT | G.I. staples | L.S. | 49.4 | 2.27 | 112.14 |
| 0123 | LAB | Mason 1st classMason 1st class | day | 0.12 | 897.00 | 107.64 |
| 0124 | LAB | Mason 2nd classMason 2nd class | day | 0.12 | 816.00 | 97.92 |
| 0114 | LAB | Beldar | day | 0.5 | 736.00 | 368.00 |
| 0102 | LAB | Blacksmith 1st class | day | 0.5 | 897.00 | 448.50 |
| 0103 | LAB | Blacksmith 2nd class | day | 0.5 | 816.00 | 408.00 |
- TOTAL
- 5,990.20
- Add 1 % Water charges on “W-A”
- +32.47
- TOTAL
- 6,022.67
- Add GST on “X-A” (multiplying factor 0.2127)
- +697.59
- TOTAL
- 6,720.26
- Add 15% CPOH on “Y-A”
- +596.59
- TOTAL
- 7,316.85
- Add Cess @ 1% on “Z-A”
- +45.74
- Cost for 333.24m
- 7,362.59
- Cost per m
- 22.09
- SAY
- ₹22.10
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1162
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1162. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.