Cutting bajri paths and making good the same including supply of extra quantities of brick aggregate, moorum and red bajri required
- Item number
- 16.14
- Analysis basis
- 10 sqm
- Priced inputs
- 5
- Derived rate
- ₹284.20/ SQM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 16.14 (Cutting bajri paths and making good the same including supply of extra quantities of brick aggregate, moorum and red bajri required) is derived from 5 priced inputs for 10 sqm and works out to ₹284.20 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- 10x0.075=0.75cum.
- Supplying and stacking 50mm brick
- aggregate at site(extra quantity)
- Supplying and stacking moorum at site
- For cutting, sorting out, spreading and
- consolidation of aggregate
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0286 | MAT | Brick Aggregate (Single size) : 50 mm nominal size | cum | 0.19 | 700.00 | 133.00 |
| SUB | Rate as per Item Number 16.3.8 of SH: Road WorkRate as per item 16.3.8 | cum | 0.06 | 1,564.90 | 93.89 | |
| SUB | Rate as per Item Number 16.3.10 of SH: RoadRate as per item 16.3.10 | cum | 0.06 | 768.25 | 46.10 | |
| 0114 | LAB | Beldar | day | 1.6 | 736.00 | 1,177.60 |
| 0115 | LAB | Coolie | day | 0.8 | 736.00 | 588.80 |
- TOTAL
- 2,039.39
- Add 1 % Water charges on “W-A”
- +18.99
- TOTAL
- 2,058.38
- Add GST on “X-A” (multiplying factor 0.2127)
- +408.04
- TOTAL
- 2,466.42
- Add 15% CPOH on “Y-A”
- +348.96
- TOTAL
- 2,815.38
- Add Cess @ 1% on “Z-A”
- +26.75
- Cost for 10 sqm.
- 2,842.13
- Cost per sqm.
- 284.21
- SAY
- ₹284.20
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1158
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1158. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.