Renewal of old putty of glass panes (length)
- Item number
- 14.9
- Analysis basis
- 13 metres
- Priced inputs
- 6
- Derived rate
- ₹56.15/ METRE
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.9 (Renewal of old putty of glass panes (length)) is derived from 6 priced inputs for 13 metres and works out to ₹56.15 per metre after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 0863 | MAT | Putty for wood work | kilogram | 0.68 | 32.00 | 21.76 |
| 9999 | MAT | Nails | L.S. | 7.15 | 2.27 | 16.23 |
| 9999 | MAT | Spirit | L.S. | 2.73 | 2.27 | 6.20 |
| 0112 | LAB | Carpenter 2nd class | day | 0.3 | 816.00 | 244.80 |
| 0114 | LAB | Beldar | day | 0.3 | 736.00 | 220.80 |
| 9999 | MAT | Sundries | L.S. | 1.43 | 2.27 | 3.25 |
- TOTAL
- 513.04
- Add 1 % Water charges on “W”
- +5.13
- TOTAL
- 518.17
- Add GST on “X” (multiplying factor 0.2127)
- +110.21
- TOTAL
- 628.38
- Add 15% CPOH on “Y”
- +94.26
- TOTAL
- 722.64
- Add Cess @ 1% on “Z”
- +7.23
- Cost of 13.00 metres
- 729.87
- Cost of 1.00 metre
- 56.14
- SAY
- ₹56.15
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1047
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1047. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.