Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level as per direction of Engineer-in-charge

Item number
14.79
Analysis basis
1 No
Priced inputs
4
Derived rate
₹433.75/ NO
D-01/RATE ANALYSISITEM 14.79

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.79 (Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level as per direction of Engineer-in-charge) is derived from 4 priced inputs for 1 No and works out to ₹433.75 per no after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • For disconnecting & dismantling of existing
  • W/s line of water storage tanks on terrace of
  • Qtrs.
  • For Bringing the tank at Ground Level
ANALYSIS OF RATES · ITEM 14.79DETAILS OF COST FOR 1 NO
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0117LABAssistant Fitter or 2nd class Fitterday0.1816.0081.60
0114LABBeldarday0.1736.0073.60
0114LABBeldarday0.2736.00147.20
9999MATSundriesL.S.1.12.272.50
BUILD-UP TO RATE
TOTAL
304.90
Add 1 % Water charges on “W”
+3.05
TOTAL
307.95
Add GST on “X” (multiplying factor 0.2127)
+65.50
TOTAL
373.45
Add 15% CPOH on “Y”
+56.02
TOTAL
429.47
Add Cess @ 1% on “Z”
+4.29
Cost for each
433.76
SAY
₹433.75
D-02/SOURCEPRINTED PAGE 1086
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1086

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1086. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.