Skip to main content

CPWD Analysis of Rates · Repairs to Buildings

Renewing glass panes, with putty and nails wherever necessary including racking out the old putty

Float glass panes of nominal thickness 5 mm (weight not less than 12.5kg/sqm)

Item number
14.5.2
Analysis basis
Detail of cost for 10 glasses area each
Priced inputs
8
Derived rate
1,416.15 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.5.2 Renewing glass panes, with putty and nails wherever necessary including racking out the old putty: Float glass panes of nominal thickness 5 mm (weight not less than 12.5kg/sqm) — is derived from 8 priced inputs for 10 glasses and works out to ₹1,416.15 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • 0.1sqm.
  • 1.00 sqm + 10% wastage= 1.10 Sqm
CodeInputUnitQuantityRate (INR)Amount (INR)
2407Float glass panes of nominal thickness 5 mm (weight not less than 12.5kg/sqm)Float glass panes of nominal thickness 5 mm (weight not less than 12.50 kg/sqm)Materialsqm1.1529.00581.90
9988Carriage including sundriesMaterialL.S.1.822.274.13
0863Putty for wood workMaterialkilogram0.6832.0021.76
9999Painting or varnishing or beewaxingMaterialL.S.5.332.2712.10
9999Sundries Nails etc.MaterialL.S.6.762.2715.35
0119GlazierLabourday0.23816.00187.68
0114BeldarLabourday0.23736.00169.28
9999Sundries such as Rag, cotton etcMaterialL.S.1.432.273.25
TOTAL
995.45
Add 1 % Water charges on “W”
9.95
TOTAL
1,005.40
Add GST on “X” (multiplying factor 0.2127)
213.85
TOTAL
1,219.25
Add 15% CPOH on “Y”
182.89
TOTAL
1,402.14
Add Cess @ 1% on “Z”
14.02
Cost of 1.00 sqm
1,416.16
Say
1,416.15

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 9999. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works