CPWD Analysis of Rates · Repairs to Buildings
Renewing glass panes, with wooden fillets wherever necessary
Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm)
- Item number
- 14.6.1
- Analysis basis
- Detail of cost for 10 glasses area each
- Priced inputs
- 10
- Derived rate
- ₹1,580.90 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.6.1 — Renewing glass panes, with wooden fillets wherever necessary: Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm) — is derived from 10 priced inputs for 10 glasses and works out to ₹1,580.90 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- 0.1sqm.
- 1.00 sqm + 10% wastage= 1.10 Sqm
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 2406 | Float glass panes of nominal thickness 4 mm (weight not less than 10kg/sqm)Float glass panes of nominal thickness 4 mm (weight not less than 10 kg/sqm)Material | sqm | 1.1 | 321.00 | 353.10 |
| 1189 | Second class teak wood in scantlingMaterial | 10 cudm | 0.025 | 776.00 | 19.40 |
| 1194 | Second class deodar wood in planksMaterial | 10 cudm | 0.025 | 500.00 | 12.50 |
| 1196 | First class kail wood in planksMaterial | 10 cudm | 0.025 | 300.00 | 7.50 |
| 9999 | Painting or varnishing or beewaxingMaterial | L.S. | 4.42 | 2.27 | 10.03 |
| 9999 | Sundries Nails etc.Material | L.S. | 2.73 | 2.27 | 6.20 |
| 0112 | Carpenter 2nd classLabour | day | 0.2 | 816.00 | 163.20 |
| 0119 | GlazierLabour | day | 0.25 | 816.00 | 204.00 |
| 0114 | BeldarLabour | day | 0.45 | 736.00 | 331.20 |
| 9999 | Sundries such as Rag, cotton etcMaterial | L.S. | 1.82 | 2.27 | 4.13 |
- TOTAL
- 1,111.26
- Add 1 % Water charges on “W”
- 11.11
- TOTAL
- 1,122.37
- Add GST on “X” (multiplying factor 0.2127)
- 238.73
- TOTAL
- 1,361.10
- Add 15% CPOH on “Y”
- 204.17
- TOTAL
- 1,565.27
- Add Cess @ 1% on “Z”
- 15.65
- Cost of 1.00 sqm
- 1,580.92
- Say
- 1,580.90
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1189. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works