Providing joists (karries) including hoisting, fixing in position and applying wood preservative on unexposed surface etc. complete with

Sal wood

Item number
14.30.1
Analysis basis
Details of cost for 300cudm.
Priced inputs
6
Derived rate
97,978.30 / cum

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.30.1 Providing joists (karries) including hoisting, fixing in position and applying wood preservative on unexposed surface etc. complete with : Sal wood — is derived from 6 priced inputs and works out to ₹97,978.30 per cum after water charges, GST, CPOH and cess. The full build-up is below.

  • Sal wood
  • 10x0.1mx0.1mx3.0m = 0.30 cum. Or = 300
  • cudm
  • Total = 306 cudm.
  • Priming coat (Wood preservative)
  • Add wastage @ 2% = 6.00 cudm.
CodeInputUnitQuantityRate (INR)Amount (INR)
1199Sal wood in scantlingMaterial10 cudm30.6600.0018,360.00
0112Carpenter 2nd classLabourday0.7816.00571.20
0114BeldarLabourday1.45736.001,067.20
0100BandhaniLabourday0.7816.00571.20
Rate as per item no 13.57.1 SH : FinishingRate as per item 13.57.1Sub-analysissqm0.854.4043.52
9999SundriesMaterialL.S.26.912.2761.09
TOTAL
20,674.21
Add 1 % Water charges on “W-A”
206.31
TOTAL
20,880.52
Add GST on “X-A” (multiplying factor 0.2127)
4,432.03
TOTAL
25,312.55
Add 15% CPOH on “Y-A”
3,790.35
TOTAL
29,102.90
Add Cess @ 1% on “Z-A”
290.59
Cost of 300 cudm.
29,393.49
Cost of 1 cum.
97,978.30
Say
97,978.30

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1068. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.