Providing joists (karries) including hoisting, fixing in position and applying wood preservative on unexposed surface etc. complete with
- Item number
- 14.30.2
- Analysis basis
- Details of cost for 300cudm.
- Priced inputs
- 6
- Derived rate
- ₹64,022.85/ CUM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.30.2 (Providing joists (karries) including hoisting, fixing in position and applying wood preservative on unexposed surface etc. complete with : Hollock wood) is derived from 6 priced inputs and works out to ₹64,022.85 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- Hollock wood in scantling
- 10x0.1mx0.1mx3.0m = 0.30 cum. Or = 300
- cudm
- Total = 306 cudm.
- Priming coat (Wood preservative)
- Add wastage @ 2% = 6.00 cudm.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 2466 | MAT | Hollock wood in scantling | 10 cudm | 30.6 | 366.00 | 11,199.60 |
| 0112 | LAB | Carpenter 2nd class | day | 0.7 | 816.00 | 571.20 |
| 0114 | LAB | Beldar | day | 1.45 | 736.00 | 1,067.20 |
| 0100 | LAB | Bandhani | day | 0.7 | 816.00 | 571.20 |
| SUB | Rate as per item no 13.57.1 SH : FinishingRate as per item 13.57.1 | sqm | 0.8 | 54.40 | 43.52 | |
| 9999 | MAT | Sundries | L.S. | 26.91 | 2.27 | 61.09 |
- TOTAL
- 13,513.81
- Add 1 % Water charges on “W-A”
- +134.70
- TOTAL
- 13,648.51
- Add GST on “X-A” (multiplying factor 0.2127)
- +2,893.78
- TOTAL
- 16,542.29
- Add 15% CPOH on “Y-A”
- +2,474.82
- TOTAL
- 19,017.11
- Add Cess @ 1% on “Z-A”
- +189.74
- Cost of 300 cudm.
- 19,206.85
- Cost of 1 cum.
- 64,022.83
- SAY
- ₹64,022.85
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1069
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1069. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.