CPWD Analysis of Rates · Repairs to Buildings
Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of windows and clerestory windows
- Item number
- 14.29
- Analysis basis
- Details of cost for window -140x110cm
- Priced inputs
- 6
- Derived rate
- ₹120.75 / kg
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.29 — Providing and fixing M.S. round or square bars with M.S. flats at required spacing in wooden frames of windows and clerestory windows — is derived from 6 priced inputs for 33.67 kg and works out to ₹120.75 per kg after water charges, GST, CPOH and cess. The full build-up is below.
- M.S. bar 16 mm dia 13x136 cm = 17.68 m @
- 1.58 kg/m = 27.93 kg
- Total = 30.72 kg or 0.307 q
- M.S. flat 40x6mm 2x96cm = 192cm+
- 1x110cm = 110cm
- = 302cm+
- Total = 332cm.@ 1.90 kg/m = 6.31 kg
- Add for wastage @ 10% =2.79 kg
- Add wastage @ 10% = 30cm
- Say 0.063 q
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 1003 | Mild steel round bar above 12 mm diaMaterial | quintal | 0.307 | 5,450.00 | 1,673.15 |
| 1008 | Flats upto 10 mm in thicknessFlats up to 10 mm in thicknessMaterial | quintal | 0.063 | 5,450.00 | 343.35 |
| 9999 | SundriesMaterial | L.S. | 26.91 | 2.27 | 61.09 |
| 0103 | Blacksmith 2nd classLabour | day | 0.35 | 816.00 | 285.60 |
| 0112 | Carpenter 2nd classLabour | day | 0.2 | 816.00 | 163.20 |
| 0114 | BeldarLabour | day | 0.45 | 736.00 | 331.20 |
- TOTAL
- 2,857.59
- Add 1 % Water charges on “W”
- 28.58
- TOTAL
- 2,886.17
- Add GST on “X” (multiplying factor 0.2127)
- 613.89
- TOTAL
- 3,500.06
- Add 15% CPOH on “Y”
- 525.01
- TOTAL
- 4,025.07
- Add Cess @ 1% on “Z”
- 40.25
- Cost of 33.67 kg.(5.74+27.93=33.67kg)
- 4,065.32
- Cost of 1 kg.
- 120.74
- Say
- 120.75
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1068. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.