CPWD Analysis of Rates · Repairs to Buildings

Fixing chowkhat in existing opening in brick/ RCC wall with dash fasteners/Chemical fasteners of appropriate size (3 nos on each vertical member of door chowkhat and 2 nos on each vertical member of window chowkhats), including Cost of dash fasteners/ chemical fastener

Item number
14.3
Analysis basis
Details of cost for 10 Nos. chowkhat.
Priced inputs
7
Derived rate
217.10 / Nos

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.3 Fixing chowkhat in existing opening in brick/ RCC wall with dash fasteners/Chemical fasteners of appropriate size (3 nos on each vertical member of door chowkhat and 2 nos on each vertical member of window chowkhats), including Cost of dash fasteners/ chemical fastener — is derived from 7 priced inputs for 10 Nos and works out to ₹217.10 each after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
0114BeldarLabourday0.27736.00198.72
0115CoolieLabourday0.195736.00143.52
0130MistryLabourday0.084897.0075.35
0128MateLabourday0.012816.009.79
9999Disposal of mulbaMaterialL.S.18.22.2741.31
7019Dash fastner/ chemical fastenerDash fastener / Chemical fastenerMaterialeach6013.00780.00
9999Hire charges of drill machine hire charges, Scaffolding and SundriesMaterialL.S.122.22.27277.39
TOTAL
1,526.08
Add 1 % Water charges on “W”
15.26
TOTAL
1,541.34
Add GST on “X” (multiplying factor 0.2127)
327.84
TOTAL
1,869.18
Add 15% CPOH on “Y”
280.38
TOTAL
2,149.56
Add Cess @ 1% on “Z”
21.50
Cost of 10 Nos.
2,171.06
Cost of each
217.11
Say
217.10

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1042. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.