Renewing bottom rail and/or top runner of collapsible gate including making good all damages and applying priming coat of zinc chromate yellow primer of approved brand and manufacturer

Item number
14.21
Analysis basis
gate of
Priced inputs
10
Derived rate
₹298.85/ KG
D-01/RATE ANALYSISITEM 14.21

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.21 (Renewing bottom rail and/or top runner of collapsible gate including making good all damages and applying priming coat of zinc chromate yellow primer of approved brand and manufacturer) is derived from 10 priced inputs for gate of and works out to ₹298.85 per kg after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • (weight 11.55 kg)
  • M.S. Tee 40x40x6 mm
  • Top rail = 1.725 m
  • Bottom rail = 1.570 m
  • Total = 3.295 m say 3.30 m @ 3.5 kg/m
  • = 11.55 kg
  • Total = 12.705 kg = 0.1270 q say 0.13 q
  • Taking out collapsible gate including frame
  • Refixing of collapsible gate including mending
  • good the demaged floor, wall etc.frame
  • Cement concrete 1:3:6 (1 cement : 3 coarse
  • sand : 6 graded stone aggregate 20 mm
  • nominal size)
  • Priming coat on Tees 0.16x3.3 = 0.53 sqm
  • Labour for fixing the gate
  • Add 10% wastage = 1.155 kg
ANALYSIS OF RATES · ITEM 14.21DETAIL OF COST FOR GATE OF SIZE 1.52X2.4 M
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1007MATStructurals such as tees,angles channels and R.S. joistsStructural steel such as tees, angles channels and R.S. joistsquintal0.135,965.00775.45
SUB(Rate as per item no 15.12.2 of SH Dismantling and Demolishing)Rate as per item 15.12.2each1502.75502.75
SUBRate as per item no 4.2.5 of SH : Concrete workRate as per item 4.2.5cum0.039,311.40279.34
SUBCement mortar 1 : 6 (1 cement : 6 fine sand) (Rate as per item No 3.6)Rate as per item 3.6cum0.013,038.5030.39
9999MATCement concrete 1:2:4 filled in chase cutL.S.24.182.2754.89
9999MATDisposal of mulbaL.S.1.822.274.13
SUBRate as per item no 13.50.3 of SH : FinishingRate as per item 13.50.3sqm0.5367.4035.72
0155LABMason (average)day0.5857.00428.50
0114LABBeldarday0.75736.00552.00
9999MATSundriesL.S.2.62.275.90
BUILD-UP TO RATE
TOTAL
2,669.07
Add 1 % Water charges on “W-A”
+18.51
TOTAL
2,687.58
Add GST on “X-A” (multiplying factor 0.2127)
+397.70
TOTAL
3,085.28
Add 15% CPOH on “Y-A”
+340.12
TOTAL
3,425.40
Add Cess @ 1% on “Z-A”
+26.08
Cost of 11.55 kg
3,451.48
Cost of 1.00 kg
298.83
SAY
₹298.85
D-02/SOURCEPRINTED PAGE 1058
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1058

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1058. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSREPAIRS TO BUILDINGS
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.