CPWD Analysis of Rates · Repairs to Buildings

Fixing of old wind tie with new fittings including painting two or more coats with anticorrosive bitumastic paint of approved brand & manufacturer over and including priming coat of ready mixed zinc chromate yellow primer of approved brand

Item number
14.20
Analysis basis
Detail of cost for 20.2 m wind tie
Priced inputs
9
Derived rate
126.00 / metre

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.20 Fixing of old wind tie with new fittings including painting two or more coats with anticorrosive bitumastic paint of approved brand & manufacturer over and including priming coat of ready mixed zinc chromate yellow primer of approved brand — is derived from 9 priced inputs for 20.2 m and works out to ₹126.00 per metre after water charges, GST, CPOH and cess. The full build-up is below.

  • @ 30 cm center to center = 68 Nos
  • Applying priming coat with ready mixed zink
  • chromate yellow primer
  • 20.2x2x(0.04+0.006) = 1.86 sqm
  • Painting with ready mixed black antcorrosive
  • bitumastic paint
CodeInputUnitQuantityRate (INR)Amount (INR)
1023Galvanised steel J or L hooks 8 mm diaMaterial10 Nos6.8130.00884.00
1208Bitumen washerMaterial100 Nos0.6830.0020.40
1209G.I. plain washer thickMaterial100 Nos0.6835.0023.80
9977Carriage of bolts, nuts and washers etc.MaterialL.S.1.172.272.66
0102Blacksmith 1st classLabourday0.34897.00304.98
0114BeldarLabourday0.34736.00250.24
9999SundriesMaterialL.S.13.912.2731.58
Rate as per item no 13.50.3 of SH : FinishingRate as per item 13.50.3Sub-analysissqm1.8667.40125.36
Rate as per item No.13.65.1 SH: FinishingRate as per item 13.65.1Sub-analysissqm1.86140.25260.87
TOTAL
1,903.89
Add 1 % Water charges on “W-A”
15.18
TOTAL
1,919.07
Add GST on “X-A” (multiplying factor 0.2127)
326.04
TOTAL
2,245.11
Add 15% CPOH on “Y-A”
278.83
TOTAL
2,523.94
Add Cess @ 1% on “Z-A”
21.38
Cost of 20.2 metres
2,545.32
Cost of 1.00 metre
126.01
Say
126.00

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1057. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.