CPWD Analysis of Rates · Repairs to Buildings

Taking out wind ties from roof including cutting out rusted bolts, nuts etc. and removing materials to any distance within compound and stacking

Item number
14.19
Analysis basis
Details of cost for 30 mtrs of weight 63 kgs
Priced inputs
3
Derived rate
5.40 / kg

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 14.19 Taking out wind ties from roof including cutting out rusted bolts, nuts etc. and removing materials to any distance within compound and stacking — is derived from 3 priced inputs for 30 mtrs and works out to ₹5.40 per kg after water charges, GST, CPOH and cess. The full build-up is below.

  • M.S. Flats 40x6mm @ 1.9kg./m = 30x1.9 = 57
  • kg. (A)
  • J’ hook bolts @ 30cm centre to centre = 101
  • Nos. x 0.15 m = 15.15 m @ 0.40kg./ m =
  • 6.06kg (B)
  • Total (A+B) = 63.06 kg Say 63 kg
CodeInputUnitQuantityRate (INR)Amount (INR)
0103Blacksmith 2nd classLabourday0.09816.0073.44
0100BandhaniLabourday0.06816.0048.96
0114BeldarLabourday0.16736.00117.76
TOTAL
240.16
Add 1 % Water charges on “W”
2.40
TOTAL
242.56
Add GST on “X” (multiplying factor 0.2127)
51.59
TOTAL
294.15
Add 15% CPOH on “Y”
44.12
TOTAL
338.27
Add Cess @ 1% on “Z”
3.38
Cost for 63 kg.
341.65
Cost of 1.00 kg
5.42
Say
5.40

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1057. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.