Centering and shuttering including strutting, propping etc. and removal of form for

Weather shed, Chajjas, corbels etc., including edges
Item number
5.9.19
Analysis basis
10 Nos
Priced inputs
6
Derived rate
₹951.10/ SQM
D-01/RATE ANALYSISITEM 5.9.19

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 5.9.19 (Centering and shuttering including strutting, propping etc. and removal of form for Weather shed, Chajjas, corbels etc., including edges) is derived from 6 priced inputs for 10 Nos and works out to ₹951.10 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Area of centring and shuttering = 9.54 sqm
  • For a weather shed over a window of size
  • 1.5mx1.2m
  • Size of weather shed 1.80x0.45m
  • Thickness at front = 0.05m
  • Thickness at fixed edge = 0.07m
  • Area in contact with concrete Bottom
  • 10x1x0.45x1.80 = 8.10
  • 10x1x0.05x1.80 = 0.90
  • 10x2x0.45x0.06 = 0.54
  • Total = 9.54 sqm.
  • Assuming that the timber will become unserviceable after being used 8 times.
  • (i) Planking 38mm thick.
  • Bottom 10x1x1.876x0.488 = 9.15 sqm.
  • 10x1x1.876x0.05 = 0.94 sqm.
  • 10x2x0.45x0.06 = 0.54 sqm.
  • Total = 10.63 sqm.
  • Total = 11.16 sqm.
  • Cubic contains
  • 11.16x0.038 = 0.424 cum = 424 cudm
  • Qty taken for cost using once = 424/8 =
  • 53.00 cudm
  • (ii) Battens10x2x0.60x0.075x0.10 = 0.09
  • Ends with bearing center
  • 10x1x0.45x0.075x0.10 = 0.03
  • Total = 0.12 cum = 120 cudm
  • Qty taken for cost using once =120/8=15
  • cudm
  • (iii) Ballies 125mm dia.
  • 10x2x2.1 = 42m
  • Wastage 5% = 2.1m
  • Total = 44.1 m
  • Qty taken for cost using once = 44.1/8 =
  • 5.513 m
  • Carriage:
  • Add 5% wastage = 0.53 sqm.
ANALYSIS OF RATES · ITEM 5.9.19DETAILS OF COST FOR 10 NOS. WEATHER SHED
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
1198MATSecond class kail wood in plankscudm 105.3260.001,378.00
1197MATSecond class kail wood in scantlingcudm 101.5260.00390.00
2447MATHollock ballies 125 mm diametermetre5.51337.00203.98
0112LABCarpenter 2nd classday3816.002,448.00
0114LABBeldarday2.5736.001,840.00
9999MATSundriesL.S.522.27118.04
BUILD-UP TO RATE
TOTAL
6,378.02
Add 1 % Water charges on “W”
+63.78
TOTAL
6,441.80
Add GST on “X” (multiplying factor 0.2127)
+1,370.17
TOTAL
7,811.97
Add 15% CPOH on “Y”
+1,171.80
TOTAL
8,983.77
Add Cess @ 1% on “Z”
+89.84
Cost for 9.54 sqm.
9,073.61
Cost of 1 sqm.
951.11
SAY
₹951.10
D-02/SOURCEPRINTED PAGE 234
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
234

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 234. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSREINFORCED CEMENT CONCRETE
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.