CPWD Analysis of Rates · Reinforced Cement Concrete
Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineerin-Charge
Coupler for 20 mm diameter reinforcement bar
- Item number
- 5.42.2
- Analysis basis
- Detail of cost for 1 Nos
- Priced inputs
- 3
- Derived rate
- ₹160.10 / no
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 5.42.2 — Providing and fixing parallel threaded couplers conforming to IS code on “Reinforcement Couplers for Mechanical Splices of Bars for Concrete Reinforcement - Specification”, to reinforcement bars including threading, enlargement at connection by forging, protecting the prepared reinforcement bars and related operations as required to complete the works per direction of Engineerin-Charge Coupler for 20 mm diameter reinforcement bar — is derived from 3 priced inputs for 1 Nos and works out to ₹160.10 per no after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 2395 | Coupler 20 mm diaMaterial | each | 1 | 42.00 | 42.00 |
| 9999 | For placing in position and fixingMaterial | L.S. | 5.9 | 2.27 | 13.39 |
| 9999 | Tapard/Parallel threading chargesMaterial | L.S. | 25.17 | 2.27 | 57.14 |
- TOTAL
- 112.53
- Add 1 % Water charges on “W”
- 1.13
- TOTAL
- 113.66
- Add GST on “X” (multiplying factor 0.2127)
- 24.18
- TOTAL
- 137.84
- Add 15% CPOH on “Y”
- 20.68
- TOTAL
- 158.52
- Add Cess @ 1% on “Z”
- 1.59
- Cost of 1 no
- 160.11
- Say
- 160.10
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 288. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.