CPWD Analysis of Rates · Reinforced Cement Concrete

Providing and fixing sheet covering over expansion joints with iron screws as per design Non-asbestos 6 mm thick fibre cement board, Type-A, Category-III as per IS: 14862:2000

150mm wide

Item number
5.29.1.1
Analysis basis
Details of cost for 3m length
Priced inputs
5
Derived rate
245.45 / m length

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 5.29.1.1 Providing and fixing sheet covering over expansion joints with iron screws as per design Non-asbestos 6 mm thick fibre cement board, Type-A, Category-III as per IS: 14862:2000 150mm wide — is derived from 5 priced inputs for 3m length and works out to ₹245.45 per m length after water charges, GST, CPOH and cess. The full build-up is below.

CodeInputUnitQuantityRate (INR)Amount (INR)
0251Non - Asbestos multi purpose fibre (high impact poly propelene reinforced) cement board 6mm thick Type-A, Category-III as per IS: 14862:2000 (3.00 x 0.15 = 0.45) + wastage @ 5% = 0.47 sqm6 mm thick fiber cement board Type A, Category III as per IS: 14862:2000Materialsqm0.47244.00114.68
9999Transportation of fibre cement sheet and accessories upto siteMaterialL.S.0.462.271.04
999950mm iron screws with washer and rawl plugsMaterialL.S.40.32.2791.48
0112Carpenter 2nd classLabourday0.2816.00163.20
0114BeldarLabourday0.2736.00147.20
TOTAL
517.60
Add 1 % Water charges on “W”
5.18
TOTAL
522.78
Add GST on “X” (multiplying factor 0.2127)
111.20
TOTAL
633.98
Add 15% CPOH on “Y”
95.10
TOTAL
729.08
Add Cess @ 1% on “Z”
7.29
Cost for 3 metre
736.37
Cost per metre
245.46
Say
245.45

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 270. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.