CPWD Analysis of Rates · Rain Water Harvesting & Tube Wells
Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge
150 mm nominal size dia
- Item number
- 23.3.2
- Analysis basis
- Details of cost for 100 metres
- Priced inputs
- 4
- Derived rate
- ₹793.25 / metre
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 23.3.2 — Supplying, assembling, lowering and fixing in vertical position in bore well, unplasticized PVC medium well casing (CM) pipe of required dia, conforming to IS: 12818, including required hire and labour charges, fittings & accessories etc. all complete, for all depths, as per direction of Engineer -in-charge 150 mm nominal size dia — is derived from 4 priced inputs for 100 metres and works out to ₹793.25 per metre after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 7745 | uPVC blind pipe 150 mm dia as per IS: 12818PVC blind pipe 150 mm dia as per IS: 12818Material | metre | 100 | 550.00 | 55,000.00 |
| 0114 | BeldarLabour | day | 0.5 | 736.00 | 368.00 |
| 0115 | CoolieLabour | day | 0.5 | 736.00 | 368.00 |
| 9999 | Sundries (Adhesive etc.)Material | L.S. | 10.07 | 2.27 | 22.86 |
- TOTAL
- 55,758.86
- Add 1 % Water charges on “W”
- 557.59
- TOTAL
- 56,316.45
- Add GST on “X” (multiplying factor 0.2127)
- 11,978.51
- TOTAL
- 68,294.96
- Add 15% CPOH on “Y”
- 10,244.24
- TOTAL
- 78,539.20
- Add Cess @ 1% on “Z”
- 785.39
- Cost of 100 metres
- 79,324.59
- Cost of 1 metre
- 793.25
- Say
- 793.25
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1875. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.