Cyclic vertical load testing of pile in accordance with IS Code of practice IS:2911 (part IV) by Kentledge method including preparation of pile head etc for Single pile
- Item number
- 20.7.1.2
- Analysis basis
- 1 test
- Priced inputs
- 1
- Derived rate
- ₹32,436.10/ TEST
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 20.7.1.2 (Cyclic vertical load testing of pile in accordance with IS Code of practice IS:2911 (part IV) by Kentledge method including preparation of pile head etc for Single pile Above 50 tonne and upto 100 tonne Safe capacity pile) is derived from 1 priced inputs for 1 test and works out to ₹32,436.10 per test after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 7250 | MAT | Cyclic verticle load testing of piles in accordance with IS : 2911 (Part-IV) including prepration of pile head etc. for Single pile above 50 tonne capacity pile and upto 100 tonne capacity pileCyclic vertical load testing of piles in accordance with IS : 2911 (Part- IV) including preparation of pile head etc. for Single pile above 50 tonne capacity pile and up to 100 tonne capacity pile | per test | 1 | 22,800.00 | 22,800.00 |
- TOTAL
- 22,800.00
- Add 1 % Water charges on “W”
- +228.00
- TOTAL
- 23,028.00
- Add GST on “X” (multiplying factor 0.2127)
- +4,898.06
- TOTAL
- 27,926.06
- Add 15% CPOH on “Y”
- +4,188.91
- TOTAL
- 32,114.97
- Add Cess @ 1% on “Z”
- +321.15
- Cost per test
- 32,436.12
- SAY
- ₹32,436.10
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1809
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1809. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.