Cyclic vertical load testing of pile in accordance with IS Code of practice IS:2911 (part IV) by Kentledge method including preparation of pile head etc for Single pile

Upto 50 tonne Safe capacity pile
Item number
20.7.1.1
Analysis basis
1 test
Priced inputs
1
Derived rate
₹19,632.40/ TEST
D-01/RATE ANALYSISITEM 20.7.1.1

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 20.7.1.1 (Cyclic vertical load testing of pile in accordance with IS Code of practice IS:2911 (part IV) by Kentledge method including preparation of pile head etc for Single pile Upto 50 tonne Safe capacity pile) is derived from 1 priced inputs for 1 test and works out to ₹19,632.40 per test after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 20.7.1.1DETAILS OF COST FOR 1 TEST
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
7249MATCyclic verticle load testing of piles in accordance with IS : 2911 (Part-IV) including prepration of pile head etc. for Single pile upto 50 tonne capacityCyclic vertical load testing of piles in accordance with IS : 2911 (Part- IV) including preparation of pile head etc. for Single pile up to 50 tonne capacityper test113,800.0013,800.00
BUILD-UP TO RATE
TOTAL
13,800.00
Add 1 % Water charges on “W”
+138.00
TOTAL
13,938.00
Add GST on “X” (multiplying factor 0.2127)
+2,964.61
TOTAL
16,902.61
Add 15% CPOH on “Y”
+2,535.39
TOTAL
19,438.00
Add Cess @ 1% on “Z”
+194.38
Cost per test
19,632.38
SAY
₹19,632.40
D-02/SOURCEPRINTED PAGE 1809
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1809

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1809. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSPILE WORK
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.