Providing & Grouting of dowel tubes / Shear keys / Joints of precast members with M-60 grade cementitious grout (Non Shrink) of approved make by suitable means ( Free flowing / pump),curing etc. Complete as per directions of Engineer-in-charge. (The payment shall be made on the basis of actual weight of approved grout injected.)

Stirrer mixed cementitious grout (non shrink) of approved make in dowel tubes / Shear keys / Joints of precast members

Item number
26.80.1
Analysis basis
Detail of cost for 250 kg non shrink cementi-
Priced inputs
4
Derived rate
85.05 / Kg

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.80.1 Providing & Grouting of dowel tubes / Shear keys / Joints of precast members with M-60 grade cementitious grout (Non Shrink) of approved make by suitable means ( Free flowing / pump),curing etc. Complete as per directions of Engineer-in-charge. (The payment shall be made on the basis of actual weight of approved grout injected.) Stirrer mixed cementitious grout (non shrink) of approved make in dowel tubes / Shear keys / Joints of precast members — is derived from 4 priced inputs for 250 kg and works out to ₹85.05 per kg after water charges, GST, CPOH and cess. The full build-up is below.

  • tious grout
  • including 5 % wastage
CodeInputUnitQuantityRate (INR)Amount (INR)
1251M-60 grade cemetitious grout (Non Shrink)M-60 grade cementitious grout (Non Shrink)Materialkg262.528.007,350.00
0122Mason (for plaster of paris work) 1st classLabourday1897.00897.00
0155Masson (Average)Mason (average)Labourday1857.00857.00
0161Helper (Technician)Labourday1736.00736.00
TOTAL
14,947.50
Add 1 % Water charges on “W”
149.48
TOTAL
15,096.98
Add GST on “X” (multiplying factor 0.2127)
3,211.13
TOTAL
18,308.11
Add 15% CPOH on “Y”
2,746.22
TOTAL
21,054.33
Add Cess @ 1% on “Z”
210.54
Cost for 250 Kg
21,264.87
Cost of 1 Kg
85.06
Say
85.05

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 2020. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.