CPWD Analysis of Rates · New Technologies and Materials
Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor
Prestressed hollow core slab above 200 mm up to 400 mm thickness
- Item number
- 26.77.2
- Analysis basis
- Detail of cost for 120 Sqm.
- Priced inputs
- 9
- Derived rate
- ₹345.15 / Sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.77.2 — Erection & Installation of Precast/Prestressed Concrete elements in correct & final position with proper line level and plumb at site making all arrangements (i.e cranes, push-pull jacks & all another T & P for lifting Placing & Alignment of elements, within erection tolerance as per IS 15916 as per approved shop drawings and all complete as per the direction of Engineer-in-Charge but excluding the cost of sim pads, non shrink grout and steel works i.e hangers. All work up to fifth floor Prestressed hollow core slab above 200 mm up to 400 mm thickness — is derived from 9 priced inputs for 120 Sqm and works out to ₹345.15 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Length of element can be more than 8.00
- metre and upto 14.00 metres.
- Labour cost for erection
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 0067 | Cost for crane upto 80 tonne capacityMachinery | day | 1 | 16,800.00 | 16,800.00 |
| 9999 | Hire charges of props & MiscMaterial | L.S. | 347 | 2.27 | 787.69 |
| 0070 | Genrator hiring 100kvaGenerator 100 KVA/125 KVAMachinery | hour | 8 | 350.00 | 2,800.00 |
| 0111 | Carpenter 1st classLabour | day | 1 | 897.00 | 897.00 |
| 0112 | Carpenter 2nd classLabour | day | 2 | 816.00 | 1,632.00 |
| 0116 | Fitter (grade 1)Labour | day | 2 | 897.00 | 1,794.00 |
| 0130 | MistryLabour | day | 2 | 897.00 | 1,794.00 |
| 0114 | BeldarLabour | day | 2 | 736.00 | 1,472.00 |
| 9999 | Sundries (Miscellaneous tools and lifting slings)Material | L.S. | 500 | 2.27 | 1,135.00 |
- TOTAL
- 29,111.69
- Add 1 % Water charges on “W”
- 291.12
- TOTAL
- 29,402.81
- Add GST on “X” (multiplying factor 0.2127)
- 6,253.98
- TOTAL
- 35,656.79
- Add 15% CPOH on “Y”
- 5,348.52
- TOTAL
- 41,005.31
- Add Cess @ 1% on “Z”
- 410.05
- Cost for 120 Sqm
- 41,415.36
- Cost of 1 Sqm
- 345.13
- Say
- 345.15
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 2018. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.