Providing & laying in position Prestressing steel strands (low relaxation) on hollow core bed by using mechanical pulling arrangement like Rabbit/ Bed master including all accessories for Stressing & destressing operations as per approved make conforming to IS1343 & grade FY-1860 etc, complete as per drawings and direction of Engineer -in-charge

Item number
26.75
Analysis basis
1740 Kg
Priced inputs
18
Derived rate
₹192.35/ KG
D-01/RATE ANALYSISITEM 26.75

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.75 (Providing & laying in position Prestressing steel strands (low relaxation) on hollow core bed by using mechanical pulling arrangement like Rabbit/ Bed master including all accessories for Stressing & destressing operations as per approved make conforming to IS1343 & grade FY-1860 etc, complete as per drawings and direction of Engineer -in-charge) is derived from 18 priced inputs for 1740 Kg and works out to ₹192.35 per kg after water charges, GST, CPOH and cess. The full build-up is below.

NOTES
  • Considering Four beds
  • 8 strands (each strand is of 9.53mm dia
  • consisting of 7 wires) X 4 beds X 120 Rmt X
  • 0.453 Unit wt = 1739.52 kg. Say 1740kg.
  • Quantity = 17.40 quintal + Add wastage 10
  • % = 1.74 q. Total = 19.14 q
  • Wedges
  • Resources - For laying and fixing cables,
  • anchorages
  • Labour- For prestressting
  • (12 HRS Required to Lay 1.914 Ton strands
  • on 4 beds)
ANALYSIS OF RATES · ITEM 26.75DETAILS OF COST FOR 1740 KG
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
0993MATFY-1860 grade wire strandsquintal19.147,500.001,43,550.00
9999MATStrand cutting by cutting saw machineL.S.5552.271,259.85
9999MATCost of wedgeL.S.6172.271,400.59
0128LABMateday1816.00816.00
0102LABBlacksmith 1st classday4897.003,588.00
0115LABCoolieday3736.002,208.00
0128LABMateday2816.001,632.00
0116LABFitter (Grade-1)Fitter (grade 1)day3897.002,691.00
0157LABOperatorsOperator (Pile/ Special machine)day2897.001,794.00
0115LABCoolieday2736.001,472.00
0032MACHStressing Machine (jack with pump)day1.512,900.0019,350.00
0028MACHHire & Running Charges of Crane 20 Ton Capacity to handle strands (8 Nos. strand coils ( averege weight 3Ton each) required to lay one bed of 8 strands as one coil can lay only one strand at a time. Therefore to operate one complete bed total 8 Nos strand coils required, hence total 3X8= 24 Ton weight will be handled for one bed)Hire and running charges of crane 20 tonne capacityday1.57,850.0011,775.00
0034MACHCutting Saw Machineday1.51,500.002,250.00
0030MACHHire charges of Generator 250 KVAGenerator 250 KVAday1.53,350.005,025.00
0035MACHStrands Roller machinery for laying strandsday1.53,900.005,850.00
0036MACHBed master (Pulling strands)day1.53,350.005,025.00
0028MACHCrane handling charges for bed master & stressing machine. One bed master approx wt = 03 Ton (to be placed on each bed with the help of crane for laying of strands ) One stressing Machine approx wt = 2.5 Ton (to be placed on each active ends of bed with the help of crane for initial pulling & stressing of strands ). Handling & Shifting of bed master & stressing machine has to be done for each bed separatelyHire and running charges of crane 20 tonne capacityday1.57,850.0011,775.00
1235MATDiesel for generator set (14 litre per hour for 11 hour)DieselLitre15489.6213,801.48
BUILD-UP TO RATE
TOTAL
2,35,262.92
Add 1 % Water charges on “W”
+2,352.63
TOTAL
2,37,615.55
Add GST on “X” (multiplying factor 0.2127)
+50,540.83
TOTAL
2,88,156.38
Add 15% CPOH on “Y”
+43,223.46
TOTAL
3,31,379.84
Add Cess @ 1% on “Z”
+3,313.80
Cost for 1740 kg
3,34,693.64
Cost of 1 Kg
192.35
SAY
₹192.35
D-02/SOURCEPRINTED PAGE 2015
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
2015

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 2015. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSNEW TECHNOLOGIES AND MATERIALS
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.