CPWD Analysis of Rates · New Technologies and Materials
Providing and fixing at Bamboo Mat board conforming to IS:13958-1994 for partition to frame by bucking or studding with screws etc. complete (Frames, backing or studding to be paid separately)
9mm thickness
- Item number
- 26.6D.4
- Analysis basis
- Details of cost for 3.5mx2m = 7.0 sqm
- Priced inputs
- 5
- Derived rate
- ₹4,906.80
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.6D.4 — Providing and fixing at Bamboo Mat board conforming to IS:13958-1994 for partition to frame by bucking or studding with screws etc. complete (Frames, backing or studding to be paid separately) 9mm thickness — is derived from 5 priced inputs and works out to ₹4,906.80 after water charges, GST, CPOH and cess. The full build-up is below.
- Partition area = 7.0sqm, Add wastage @ 5%
- = 0.35sqm, Total area = 7.35 sqm
- MATERIAL:
- Weight: 7.35sqm x 8.40 kgs/sqm =61.74 kgs
- = 0.06 tonne.
- LABOUR:
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 8149 | 9mm thick Bamboo Mat Board conforming to IS 13958:19949 mm thick Bamboo Mat Board conforming to IS 13958:1994Material | sqm | 7.35 | 2,932.00 | 21,550.20 |
| 2358 | Carriage of 9mm thick Bamboo mat board and accessoriesCarriage of Bamboo Mat corrugated sheets and accessoriesMaterial | tonne | 0.06 | 17,700.00 | 1,062.00 |
| 9999 | Sundries and screwsMaterial | L.S. | 26.91 | 2.27 | 61.09 |
| 0112 | Carpenter 2nd classLabour | day | 0.9 | 816.00 | 734.40 |
| 0114 | BeldarLabour | day | 1 | 736.00 | 736.00 |
- TOTAL
- 24,143.69
- Add 1 % Water charges on “W”
- 241.44
- TOTAL
- 24,385.13
- Add GST on “X” (multiplying factor 0.2127)
- 5,186.72
- TOTAL
- 29,571.85
- Add 15% CPOH on “Y”
- 4,435.78
- TOTAL
- 34,007.63
- Add Cess @ 1% on “Z”
- 340.08
- Cost of 7 sqm
- 34,347.71
- Cost of 1sqm
- 4,906.82
- Say
- 4,906.80
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1916. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.
See how estimation works