Water proofing treatment of RCC sunshade with Zycosil/equivalent water proofing Solution (1 litre of Zycosil/equivalent & 20 litres of water stirred first & 2 litres of Zycoprime/equivalent added and stirred (total 23 litres)) till it meets the saturation level and testing as per RILEM or by water drops test in which water drops do not absorb but drops remain or rolls
- Item number
- 26.60
- Analysis basis
- 40 sqm
- Priced inputs
- 4
- Derived rate
- ₹136.45/ SQM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.60 (Water proofing treatment of RCC sunshade with Zycosil/equivalent water proofing Solution (1 litre of Zycosil/equivalent & 20 litres of water stirred first & 2 litres of Zycoprime/equivalent added and stirred (total 23 litres)) till it meets the saturation level and testing as per RILEM or by water drops test in which water drops do not absorb but drops remain or rolls) is derived from 4 priced inputs for 40 sqm and works out to ₹136.45 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| 8519 | MAT | Zycosil / equivalent | litre | 1 | 1,440.00 | 1,440.00 |
| 8518 | MAT | Zycoprime /equivalentZycoprime / equivalent | litre | 2 | 170.00 | 340.00 |
| 9999 | MAT | Water, technical supervision, etc. | L.S. | 7 | 2.27 | 15.89 |
| 0131 | LAB | Painter | day | 2.5 | 816.00 | 2,040.00 |
- TOTAL
- 3,835.89
- Add 1% water charges
- +38.36
- TOTAL
- 3,874.25
- Add GST on “X” (multiplying factor 0.2127)
- +824.05
- TOTAL
- 4,698.30
- Add 15% CPOH on “Y”
- +704.75
- TOTAL
- 5,403.05
- Add Cess @1% on “Z”
- +54.03
- Cost of 40 sqm
- 5,457.08
- Cost of 1 sqm
- 136.43
- SAY
- ₹136.45
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 1991
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1991. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.