Skip to main content

CPWD Analysis of Rates · New Technologies and Materials

Providing & fixing in position Phenol bonded Bamboowood panelled or panelled and glazed shutters for doors windows, clerestorey windows with pre-molded minimum 30mm thick planks, in approved colours, texture & finish. It shall have 10mm wide, 25mm deep grove to fit in panels.The bamboo wood shall have minimum density of 1000 Kg/cum, minimum Hardness 1000 Kgf. All styles and rails shall have profiled interlocking system locked in place by bamboo pins, all complete as per direction of Engineer in charge. (The panelling will be paid for separately)

Item number
26.4
Analysis basis
Details of cost for shutters of Bamboowood
Priced inputs
6
Derived rate
6,935.75 / sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.4 Providing & fixing in position Phenol bonded Bamboowood panelled or panelled and glazed shutters for doors windows, clerestorey windows with pre-molded minimum 30mm thick planks, in approved colours, texture & finish. It shall have 10mm wide, 25mm deep grove to fit in panels.The bamboo wood shall have minimum density of 1000 Kg/cum, minimum Hardness 1000 Kgf. All styles and rails shall have profiled interlocking system locked in place by bamboo pins, all complete as per direction of Engineer in charge. (The panelling will be paid for separately) — is derived from 6 priced inputs for shutters of and works out to ₹6,935.75 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • 200 x 108cm = 2.16 sqm
  • Styles 4x2.00x0.115x0.03 =0.0276 cum +
  • Top rails 1x1.08x0.11x0.03m = 0.0036 cum +
  • Bottom rails 1x1.08x0.212x0.03 = 0.0069 cum +
  • Lock rails 1x1.08x0.18x0.03 = 0.0058 cum
  • Total =0.0439 cum + 0.004 cum
  • (Wastage @5%)
  • Grand Total =0.0483 cum OR 48.30 cudm
CodeInputUnitQuantityRate (INR)Amount (INR)
8028Bamboo wood shutter of doorsMaterial10 cudm4.832,018.759,750.56
8215Stainless steel butt hinges 125x64x1.9 mm IS : 12817 markedMaterial10 Nos0.4388.00155.20
8211Stainless steel screws 40 mmMaterial100 Nos0.32270.0086.40
0156Carpenter (average)Labourday0.33857.00282.81
0114BeldarLabourday0.33736.00242.88
9999Sundries T&P etc.MaterialL.S.5.622.2712.76
TOTAL
10,530.61
Add 1 % Water charges on “W”
105.31
TOTAL
10,635.92
Add GST on “X” (multiplying factor 0.2127)
2,262.26
TOTAL
12,898.18
Add 15% CPOH on “Y”
1,934.73
TOTAL
14,832.91
Add Cess @ 1% on “Z”
148.33
Cost of 2.16 sqm
14,981.24
Cost of 1 sqm
6,935.76
Say
6,935.75

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1909. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works