Skip to main content

CPWD Analysis of Rates · New Technologies and Materials

Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2)

25 mm average thickness in 2 layers

Item number
26.32.2
Analysis basis
Details of Cost for 10 Sqm
Priced inputs
6
Derived rate
587.35 / Sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.32.2 Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2) 25 mm average thickness in 2 layers — is derived from 6 priced inputs for 10 Sqm and works out to ₹587.35 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • Cement mortar 1:4 (1 cement : 4 coarse
  • sand) =(0.144/12)x25=0.30 Cum
  • Cement 0.30x0.38 = 0.114 MT OR 114 kg
  • @ 2% of weight of cement 114kgx2%
  • =2.28kg
CodeInputUnitQuantityRate (INR)Amount (INR)
Rate as per Item No.3.9 of SH: MORTARSRate as per item 3.9Sub-analysiscum0.34,211.701,263.51
7914SBR PolymerMaterialkg2.28200.00456.00
0155Mason (average)Labourday0.94857.00805.58
0115CoolieLabourday1.02736.00750.72
0101BhistiLabourday1.01816.00824.16
9999Scaffolding and sundriesMaterialL.S.12.612.2728.62
TOTAL
4,128.59
Add 1 % Water charges on “W”
41.29
TOTAL
4,169.88
Add GST on “X” (multiplying factor 0.2127)
886.93
TOTAL
5,056.81
Add 15% CPOH on “Y”
758.52
TOTAL
5,815.33
Add Cess @ 1% on “Z”
58.15
Cost for 10 sqm
5,873.48
Rate per sqm
587.35
Say
587.35

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1951. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works