Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2)

12 mm average thickness

Item number
26.32.1
Analysis basis
Details of Cost for 10 Sqm
Priced inputs
6
Derived rate
388.65 / Sqm

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.32.1 Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2) 12 mm average thickness — is derived from 6 priced inputs for 10 Sqm and works out to ₹388.65 per sqm after water charges, GST, CPOH and cess. The full build-up is below.

  • Cement mortar 1:4 (1 cement : sand) =
  • 0.144 Cum
  • Qty of cement in mortar= 0.144x0.38= 0.055
  • MT or 55kg
  • @ 2% of weight of cement 55kgx2%=1.10
  • kg
CodeInputUnitQuantityRate (INR)Amount (INR)
Rate as per Item No.3.9 of SH:MORTARSRate as per item 3.9Sub-analysiscum0.1444,211.70606.48
7914SBR PolymerMaterialkg1.1200.00220.00
0155Mason (average)Labourday0.67857.00574.19
0115CoolieLabourday0.75736.00552.00
0101BhistiLabourday0.92816.00750.72
9999Scaffolding and sundriesMaterialL.S.12.612.2728.62
TOTAL
2,732.01
Add 1 % Water charges on “W”
27.32
TOTAL
2,759.33
Add GST on “X” (multiplying factor 0.2127)
586.91
TOTAL
3,346.24
Add 15% CPOH on “Y”
501.94
TOTAL
3,848.18
Add Cess @ 1% on “Z”
38.48
Cost for 10 sqm
3,886.66
Rate per sqm
388.67
Say
388.65

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1950. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.