Providing and fixing concealed hinge of approved quality for 19-20mm thick door with stainless steel screws complete :

Item number
26.11
Analysis basis
10 nos
Priced inputs
5
Derived rate
₹144.05/ NO
D-01/RATE ANALYSISITEM 26.11

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 26.11 (Providing and fixing concealed hinge of approved quality for 19-20mm thick door with stainless steel screws complete :) is derived from 5 priced inputs for 10 nos and works out to ₹144.05 per no after water charges, GST, CPOH and cess. The full build-up is below.

ANALYSIS OF RATES · ITEM 26.11DETAILS OF COST FOR 10 NOS
CodeTypeInputUnitQuantityRate (INR)Amount (INR)
8226MATConcealed zinc coated hinges 19-20 mm thick with mounting plate10 Nos1570.00570.00
8210MATStainless steel screws 50 mm100 Nos0.8320.00256.00
9977MATCarriage of materialL.S.2.732.276.20
0112LABCarpenter 2nd classday0.14816.00114.24
0114LABBeldarday0.09736.0066.24
BUILD-UP TO RATE
TOTAL
1,012.68
Add 1 % Water charges on “W”
+10.13
TOTAL
1,022.81
Add GST on “X” (multiplying factor 0.2127)
+217.55
TOTAL
1,240.36
Add 15% CPOH on “Y”
+186.05
TOTAL
1,426.41
Add Cess @ 1% on “Z”
+14.26
Cost of 10 nos
1,440.67
Cost of 1 no
144.07
SAY
₹144.05
D-02/SOURCEPRINTED PAGE 1920
PUBLISHED BY
Central Public Works Department (CPWD)
EDITION
DAR 2023 · Delhi
EFFECTIVE
2023-09-14Both volumes are dated 14 September 2023 on their title pages.
RETRIEVED
2026-09-08
GST
18%, added in each item's build-up
PRINTED PAGE
1920

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 1920. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

D-03/ADJACENT ITEMSNEW TECHNOLOGIES AND MATERIALS
ARCHED / ESTIMATING

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.