CPWD Analysis of Rates · Masonry Work

Extra for forming cavity 5 cm to 11.5 cm wide in cavity walls with necessary weep and vent holes including use of cores and cost of providing and fixing bitumastic coated M .S. ties 300 mm long of 25x3 mm section at not less than 3 ties per sqm as per approved design

Item number
6.6
Analysis basis
Details of cost for 10sqm.
Priced inputs
6
Derived rate
234.20

Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 6.6 Extra for forming cavity 5 cm to 11.5 cm wide in cavity walls with necessary weep and vent holes including use of cores and cost of providing and fixing bitumastic coated M .S. ties 300 mm long of 25x3 mm section at not less than 3 ties per sqm as per approved design — is derived from 6 priced inputs and works out to ₹234.20 after water charges, GST, CPOH and cess. The full build-up is below.

  • Mild steel 25mmx3mm section 30cm long
  • 30 No. = 9 metres @ 0.6kg/m = 5.40 kg
CodeInputUnitQuantityRate (INR)Amount (INR)
1008Flats upto 10 mm in thicknessFlats up to 10 mm in thicknessMaterialquintal0.0545,450.00294.30
9999Painting the steel BitumenMaterialL.S.13.522.2730.69
0123Mason 1st classMason 1st classLabourday0.37897.00331.89
0124Mason 2nd classMason 2nd classLabourday0.37816.00301.92
0114BeldarLabourday0.92736.00677.12
9999Add for use of CoreMaterialL.S.4.552.2710.33
TOTAL
1,646.25
Add 1 % Water charges on “W”
16.46
TOTAL
1,662.71
Add GST on “X” (multiplying factor 0.2127)
353.66
TOTAL
2,016.37
Add 15% CPOH on “Y”
302.46
TOTAL
2,318.83
Add Cess @ 1% on “Z”
23.19
Cost for 10 sqm.
2,342.02
Cost for 1 sqm.
234.20
Say
234.20

From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 311. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.

Use this rate in a live estimate

This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. Arched reads the tender, maps it to the applicable schedule, and flags where the numbers are exposed before submission.

See how estimation works