CPWD Analysis of Rates · Masonry Work
Tile brick masonry work 5 cm thick with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in cement mortar 1:3 (1 cement : 3 coarse sand) in superstructure above plinth and upto floor five level
- Item number
- 6.22
- Analysis basis
- Details of cost for 10 sqm.
- Priced inputs
- 8
- Derived rate
- ₹885.45 / sqm
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 6.22 — Tile brick masonry work 5 cm thick with common burnt clay F.P.S. (non modular) tile bricks of class designation 10 in cement mortar 1:3 (1 cement : 3 coarse sand) in superstructure above plinth and upto floor five level — is derived from 8 priced inputs for 10 sqm and works out to ₹885.45 per sqm after water charges, GST, CPOH and cess. The full build-up is below.
- Extra labour for lifting of material (above
- floor two level up to floor five level)
- (10x0.05x1.13=0.57)
| Code | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|
| 1984 | Common burnt clay F.P.S. (non modular) bricks tile class designation 10Common burnt clay F.P.S. bricks tile class designation 10Material | 1000 Nos | 0.377 | 4,750.00 | 1,790.75 |
| Rate as per Item Number 3.8 of SH: MortarsRate as per item 3.8Sub-analysis | cum | 0.15 | 4,881.95 | 732.29 | |
| 9999 | Sundries and scaffoldingMaterial | L.S. | 8.06 | 2.27 | 18.30 |
| 0123 | Mason 1st classMason 1st classLabour | day | 0.94 | 897.00 | 843.18 |
| 0124 | Mason 2nd classMason 2nd classLabour | day | 0.94 | 816.00 | 767.04 |
| 0115 | CoolieLabour | day | 1.88 | 736.00 | 1,383.68 |
| 0101 | BhistiLabour | day | 0.33 | 816.00 | 269.28 |
| 0115 | CoolieLabour | day | 0.57 | 736.00 | 419.52 |
- TOTAL
- 6,224.04
- Add 1 % Water charges on “W”
- 62.24
- TOTAL
- 6,286.28
- Add GST on “X” (multiplying factor 0.2127)
- 1,337.09
- TOTAL
- 7,623.37
- Add 15% CPOH on “Y”
- 1,143.51
- TOTAL
- 8,766.88
- Add Cess @ 1% on “Z”
- 87.67
- Cost of 10 Sqm.
- 8,854.55
- Cost per sqm.
- 885.46
- Say
- 885.45
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 323. Reference only — CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.