Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete
- Item number
- 11.7
- Analysis basis
- one cum
- Priced inputs
- 5
- Derived rate
- ₹8,595.15/ CUM
Under the CPWD Delhi Analysis of Rates 2023 (Civil), item 11.7 (Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete) is derived from 5 priced inputs for one cum and works out to ₹8,595.15 per cum after water charges, GST, CPOH and cess. The full build-up is below.
- Cement concrete 1:2:4
- Extra labour for laying in floors etc.
| Code | Type | Input | Unit | Quantity | Rate (INR) | Amount (INR) |
|---|---|---|---|---|---|---|
| SUB | Rate as per item No.4.1.3 of S.H.Concrete WorkRate as per item 4.1.3 | cum | 1 | 7,878.50 | 7,878.50 | |
| 0124 | LAB | Mason 2nd classMason 2nd class | day | 0.35 | 816.00 | 285.60 |
| 0114 | LAB | Beldar | day | 0.18 | 736.00 | 132.48 |
| 0101 | LAB | Bhisti | day | 0.05 | 816.00 | 40.80 |
| 9999 | MAT | Sundries | L.S. | 19.76 | 2.27 | 44.86 |
- TOTAL
- 8,382.24
- Add 1 % Water charges on “W-A”
- +5.04
- TOTAL
- 8,387.28
- Add GST on “X-A” (multiplying factor 0.2127)
- +108.22
- TOTAL
- 8,495.50
- Add 15% CPOH on “Y-A”
- +92.55
- TOTAL
- 8,588.05
- Add Cess @ 1% on “Z-A”
- +7.10
- Cost of 1 Cum.
- 8,595.15
- SAY
- ₹8,595.15
- PUBLISHED BY
- Central Public Works Department (CPWD)
- EDITION
- DAR 2023 · Delhi
- EFFECTIVE
- 2023-09-14Both volumes are dated 14 September 2023 on their title pages.
- RETRIEVED
- 2026-09-08
- GST
- 18%, added in each item's build-up
- PRINTED PAGE
- 759
From the CPWD Delhi Analysis of Rates 2023 (Civil), Volumes I & II, printed page 759. For reference only. CPWD amends rates through correction slips between editions, so verify against the official source before pricing a bid.
Use this rate in a live estimate
This is the CPWD base analysis. A real estimate adjusts it for the project's inputs and the current cost index, then maps it to the tender's BOQ. We can do this for you: send the tender and we return a priced BOQ on the applicable schedule, with rate build-ups and an engineer's sign-off.